An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. City of DeephavenComprehensive Marina Plan Submitted byThe Deephaven Boat Committee02-16-2006 Deephaven Boat Committee

  2. History of the Deephaven Marina Resources Established in early years of the village. • To provide lake access for those who did not own lake shore. • To fully utilize a public resource. Public Consensus Maintaining the docks for public use is a good thing for Deephaven Historical Issues: Community wants a fair system. As a publicly owned resource it must be maintained and improved if possible. Due to constraints imposed by LMCD Deephaven cannot substantially increase marina resources. Competing Interests • Original date of origin is unknown, but it appears that marina was rebuilt after the tornado of 1965. • The resources provided by Deephaven have remained fairly constant over the past fifty years. • Until the mid-90’s demand was close to supply. Lake shore Owners Non lake shore owners wanting access Accepted Process No Interest in Marina Resources The current approach to allocation, though not without objection is the preferred system of choice at this time.

  3. Current Statistics on Wait Time for Resources: • Marina Resources Available for Community Access: • 1. Docks for large power Boats • Number Available 80 • Number on Waiting List 403 • Date of Next on List 5/15/87 • 2. Buoys for Sailboats • Number Available 53 • Number on Waiting List 123 • Date of Next on List 8/15/97 • 3. Shore Stations for large • powerboats • Number Available 12 • Number on Waiting List 201 • Date of Next on List 3/26/87 • 4. Slides for smaller boats not exceeding 16’ + Street ends • Number Available 125 • Number on Waiting List 110 • Date of Next on List 11/15/98 • 5. Canoe racks for canoes and small portable boats • Number Available 3 • Number on Waiting List 33 • Date of Next on List5/20/02

  4. Key Details to the Comprehensive Marina Plan The Plan • Substantially improves the current infrastructure of docks and slides. • Enable a transition from smaller boats to providing an infrastructure that will match the current demand for larger boats. • Eliminates unsightly shore stations. • Potentially expands Deephaven beach. The Demand Larger power boats in docks. A safer infrastructure. Removal of unsightly shore stations. Larger boats on slides. Reduced demand for sail boats. Replacement of deteriorating dock system. Simply maintaining the current infrastructure is not an acceptable alternative to meet the changing demand of Deephaven residents.

  5. Historical and Current Marina Issues • Self-Sustaining Fees • Revenue rental has exceeded annual maintenance expenses. • Increased rates have significantly increased reserves. • Marina resources, though maintained annually have continued to degrade. Docks are now in critical need for overhaul and replacement. Buoy cables and weights need replacement 1. Current Annual Maintenance Costs of Marina Resources • $10,000.00 2. Current Annual Overall Costs of Marina. • $76,892 Overall reconfiguration of marina resources is essential Slides are being damaged by boats that are too large to sustain them • Reserves: • $108,273 in Feb. 2006 • $170,000 ca. in Nov. 2006

  6. Issues Yet to be Resolved St. Louis Bay: • North property line in St. Louis bay • Board Walk Definition (To be worked through with Park Committee. A presentation to the park board is necessary) • Definition of the Swimming Deck over the steel breakwater • Designation and location of two types of slides (S=slide) • S.1 (Current slide configuration without winches) • S.2 (Large boats requiring winch with ramp using one of two winch systems recommended by the Boat Committee) • Carson Bay: • Actual number of docks is subject to change. • Buoy cables and weight replacement for sales boats • General Issues: • 100 foot red line on schematics for Carson and • Cash reserves in relation to construction costs • Projected life of new docks • Final Drawings from Bolton-Mink incorporating the last issues • Actual measurements of Excelsior docks to be used to determine fin • al dock size in plan. • Cost estimates based on actual costs of docks in Excelsior, Wayzata, and Mound

  7. Promoting Desired Outcomes: Plan Description Outcomes Improves upon current infrastructure Attributes of a well designed plan Addresses immediate shortfalls of current resources Provides added benefit to the park resources Considers the input of all parties with vest interests. Considers the needs of the larger community Increased demand Long term vision Increased Remains flexible to new input Increased knowledge base The plan addresses some of the most significant issues currently facing marina resources, without changing the current allocation.

  8. Target Dates Toward Implementation • Implementation Process: 5. Develop Plan Specifications August 2006 6. Submit Plans for bid 7. October 2006 8. Issue Bond/Payment Plan November 2006 1. Council Review of Comprehensive Plan February 2006 Issues Resolution 2. City Council Initial Approval March 2006 3. Public Hearing End of April 2006 4. Council Approval May 2006 9. Announce timeline for construction completion December 2006 10. Award Bids December 2006 11. Construction Begins January-February 2007 Arrange for rescheduling of slide and dock allocations January-April, 2007 Issues Resolution Presentation Preparation For LMCD LMCD Meetings June-July 2006 Issues Resolution