1 / 12

Models in I.E. Lecture 5

Models in I.E. Lecture 5. Project Management Network Models. IE 2030 Lecture 5: Project Management. The problems of project management Use of network models Gantt charts PERT/CPM networks Drawing the networks Critical Paths Dealing with uncertainty. IE 2030 Lecture 5: Project Management.

Télécharger la présentation

Models in I.E. Lecture 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Models in I.E. Lecture 5 Project Management Network Models

  2. IE 2030 Lecture 5: Project Management • The problems of project management • Use of network models • Gantt charts • PERT/CPM networks • Drawing the networks • Critical Paths • Dealing with uncertainty

  3. IE 2030 Lecture 5: Project Management • Getting everything done in Sr. Design • Managing a software project • Building a house; construction management • Planning a wedding

  4. IE 2030 Lecture 5: Project Management • Many ACTIVITIES • Some can be performed in parallel • Others are constrained by PRECEDENCE RELATIONSHIPS Lay Foundation

  5. IE 2030 Lecture 5: Project Management Excavate Lay Foundation

  6. IE 2030 Lecture 5: Project Management Excavate Lay Foundation Buy Roofing Material

  7. IE 2030 Lecture 5: Project Management Specs Design Pseudocode Debug Walkthrough Code Documentation Test Packaging Beta Test

  8. IE 2030 Lecture 5: Project Management • The Mythical Man-Month by Brooks • Project team size or other resource constraints often limit work rate • Time requirements for activities may be uncertain • Goal of network scheduling models: complete project on time w/o excessive cost. Decide who does what, when?

  9. IE 2030 Lecture 5: Project Management • Main goal: schedule activities and assign resources to activities. • Other goals: • allocate resources effectively to achieve main goal • keep track of an ongoing project, make adjustments

  10. IE 2030 Lecture 5: Gantt Charts • Old, Still Used • Not as good as PERT/CPM Networks, especially for Precedence Relationships

  11. IE 2030 Lecture 5: Project Management Select Programming Team Specs Design Pseudocode Debug Walkthrough Code Documentation Test Packaging Beta Test

  12. IE 2030 Lecture 5: Project Management Select Programming Team Dummy Specs Design Pseudocode Debug Walkthrough Code Documentation Test Packaging Beta Test

More Related