1 / 3

Full TC Activities

Security, Privacy & Infrastructure TC High Level Work Plan. Face to Face: 5/12-5/14. Candidate Standards. IRB R&D. 90 minute calls: 1:00pm – 2:30pm EDT. 5/29. 6/4. 4/10. 4/17. 4/24. 5/1. 5/8. 5/15. 5/22. RDSS Section 2: Requirements. RDSS S3: Design.

jeanne
Télécharger la présentation

Full TC Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Security, Privacy & Infrastructure TC High Level Work Plan Face to Face:5/12-5/14 CandidateStandards IRB R&D 90 minute calls: 1:00pm – 2:30pm EDT 5/29 6/4 4/10 4/17 4/24 5/1 5/8 5/15 5/22 RDSS Section 2: Requirements RDSS S3: Design RDSS Sections 1-4: Candidate Standards New Construct Development Report on inherited constructs Troubleshoot Requirements & Design issues Consumer Use Cases Provider Use Cases Population Use Cases Meeting cancelled See Agenda F2F Report out Full TC Activities Form Construct Teams as needed Report TP20 awaiting standards development… Report TP30 awaiting standards development… Report TN900 Report T17 Individual/ Team Work Items Education & Outreach (as needed) NHIN Responses (as needed) Report Med Mgt (Dig Sig & T17,C44 etc) Lab Message (TP14)

  2. Use Case Meetings • Pre-work: • Send previous work items to PTCs leadership as read-ahead • Invite PTCs/liaisons to participate in SPI-TC scheduled meetings • Agenda for each Use Case Call: • Use Case 1: • Scope/Design from Perspective TC (10 mins) • Review analysis on the use case with PTC (20 mins) • Reach Consensus on construct design (reuse/repurpose/new) (10 mins) • Use Case 2: • Scope/Design from Perspective TC (10 mins) • Review analysis on the use case with PTC (20 mins) • Reach Consensus on construct design (reuse/repurpose/new) (10 mins)

  3. Draft Face 2 Face Agenda • Requirements & Design with PTCs • Reports from Teams: • TP20 • TP30 • T17 • TN900 • TC review and adoption of ICM-WG recommendations

More Related