An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMPT 370 Course Project Library Information System Analysis and Design

  2. Your Project TA • Where: CSIL MTF Lab • When : Monday 12:30-1:30 Wednesday 15:00-17:00 Friday 11:30-12:30 Or By appointment • Email: htw@sfu.ca

  3. The Menu • Introduction • Stake-Holders • Analysis Component • Design Component • Question and Answer

  4. Introduction • Library is a repository of Information • The information comes in a wide variety of formats • The library system is complex • A perfect system does not exist • Determine the most crucial components • The project is limited by the time available

  5. The Information Pot • Paper based information: books, journals, magazine, newspaper, and maps • Multimedia based information: CDs, VHS, DVDs, LPs, Internet Connected Computers • A connected set of repositories

  6. The Stake-Holders • Users • Librarians • Library Administrators • Others ?

  7. The Users • Diverse group • Varying • Expectations • Way of thinking • Experience • Familiarity with library systems • Circumstances • The library is build for the people that uses them, and so must the system we’re building.

  8. The Librarians • Knowledgeable professional • Sub-Pools handled by one librarian • Helpers for users • Manages the information pool. • Knows the intricate details of the library

  9. Library Administrator • Decision maker • Sometimes Librarians take on this role • Make book purchases • Can be the central authority of all branches • High level view

  10. What are we doing? • The ultimate goal • Satisfy all the stake-holders to within some reasonable limits (Making tradeoffs). • Ensure the software is maintainable, upgradeable, and extensible • Find out what is necessary (Analysis) • Turn it into something you can implement (Design)

  11. The Menu • Introduction • Stake-Holders • Analysis Component • Design Component • Question and Answer

  12. Analysis • A.K.A Requirements gathering • Interview all the stake holders • Observe the current process • Put the observation into a model

  13. Analysis (What To Do) • Model the domain (as-is:to-be) • Domain models should be simple but… • Document the functional requirement using use-case and use-case diagrams • Document the vocabulary used within the domain • Domain model will help you limit the scope of the project

  14. Analysis • Complete capture of the domain is essential • Look for Implicit requirements • A thoughtful model is required • CRC method is recommended

  15. The Menu • Introduction • Stake-Holders • Analysis Component • Design Component • Question and Answer

  16. Design (Putting Your Analysis to Work) • Translating the domain model into models that developers can understand. • Tools of the trade: • Use-Cases( Which you should have done) • Class Diagrams • State Diagrams • Interaction Diagrams • Activity Diagrams, • Component Diagrams • Architecture Diagrams • Make use of any of the tools needed

  17. Design • One step before implementation • Detailed design is necessary for a completely new system • However re-use of pre-existing implementation can possible reduce the design granularity • The design documents must clearly reflect what the implementation will look like.

  18. Design • Remember the goal of the system • Time is the biggest issue.

  19. The Menu • Introduction • Stake-Holders • Analysis Component • Design Component • Question and Answer