An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NABUUR GAMAULI CONSTRUCTION OF TWO ROOMS’ BUILDING

  2. Partners Local Level: Krishna Primary School/Management committee/local community International level: Nabuur

  3. Partner school of Nabuur

  4. Development so far • Student number increased from 145 to 209 • Mr. Garry Miller has supported salary for two teacher now the number of teacher is 5 (government supported -2, Nabuur suppored- 2 & community supported-2) • Sufficient teaching materials- provided by Stacy Helmus • Parents visit school and work together • Teachers are punctual work trying child centered education

  5. Community combination • Total house holds: 200 • Dalits: 104 • Thakuri: 39 • Chhetries: 57 • Occupation • Farming: All families • Employ: • 11 people in private companies • 7 people in government offices

  6. Recent needs and priority • Building with two rooms • Training for teachers (Child centered) and materials • Compound wall (125 Meter) • Drinking water • Toilet

  7. Community participation • Community can participate in following areas • Labor contribution (un skilled) • Wood • transportation

  8. Support Required • Following support is required with partner • Cash for Cement • Cash for Rods • Cash for skilled labor • Bricks/stone • Grill • Other things that need to import from outside

  9. Total length: 46 Feet Map of building • Map ( 23Š20 Feet/room) Old building Further extension East elevation

  10. Measurement Details Windows; • Length= 6 feet • Height= 5 feet Doors; • Breath=3feet • Height= 7feet Wall; Thick= 14 Inch Height=11 feet

  11. Questions asked by Tatjana • Floor plan, elevation, sections, dimensions, position of entrance, north orientation, photos of the building, Ans: Pls. go to building sketch, it is decided by local contractor and me. • Marked place for the future extension Ans: Marked in map • Roof is concrete slap • Measures are in feet • Foundation depth is 5 feet • Materials are stone, sand, cement, wood, concrete, rods etc

  12. Estimated Cost

  13. Estimated cost