1 / 19

SAFE OFFSHORE VESSEL POSITIONING PRACTICE

SAFE OFFSHORE VESSEL POSITIONING PRACTICE. MOORING ANALYSIS. Orcaflex Workshop, 23 rd Jun 2012 IDEC, Intercontinental, Mumbai. AGENDA. Challenges in present Station Keeping Mooring Analysis … A glance Mooring Analysis – Usage Mooring Analysis – Stages, Categories

jetta
Télécharger la présentation

SAFE OFFSHORE VESSEL POSITIONING PRACTICE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAFE OFFSHORE VESSEL POSITIONING PRACTICE MOORING ANALYSIS Orcaflex Workshop, 23rd Jun 2012 IDEC, Intercontinental, Mumbai

  2. AGENDA Challenges in present Station Keeping Mooring Analysis … A glance Mooring Analysis – Usage Mooring Analysis – Stages, Categories Advantage with FUGRO-Vedam collaboration

  3. Challenges in Present Station Keeping • Complex platform and sub-sea infrastructure • Vessel positioning in close proximity to assets • Stringent safety requirement • Longer mooring durations • Operational requirement: gangway connections, helicopter operations • Vessel response under accidental damage of a line • Support vessel’s movement in close proximity to barge • Unconventional requirements: Connection to Jacket leg, DP buoys etc.. MOORING ANALYSIS IS A TOOL TO SIMULATE COMPLEX NATURE OF STATION KEEPING TO ENSURE SAFETY AND REDUCE RISK DURING OFFSHORE OPERATION

  4. Global Standards…

  5. POSITIONING SERVICE – way ahead… CLIENT/MWS

  6. Mooring Analysis – An Overview...

  7. Mooring Analysis – An Overview... • Motion analysis & determining RAO • Modelling of mooring pattern • Quasi-static Mooring Analysis (equilibrium position) • Rule Check as per API/ISO/DNV Standards

  8. Mooring Analysis … An Overview • Catenary shape & positioning of mooring buoy • Safe vertical distance from sub-sea pipelines • Limiting anchor loads • Chain lengths for DP buoys • One line Damage analysis • Limiting line tensions • Limiting vessel excursions

  9. Mooring Analysis … An Overview • Transient analysis • Vessel trajectory after breakage of a line • Maximum vessel offsets from platform/assets. • Detailed Report and Anchor Pattern with catenary diagrams,

  10. Usage of Mooring Analysis … • Derivation of exact catenary shapes • Correct estimation of distance between subsea structure and mooring lines/anchors. • Mooring optimization to meet stringent safety requirement • Stabilisation of vessel motion, excursion • Clash Check • Usage of Damage Prevention Buoys • Derivation of limiting weather • Vessel Relocation Capability

  11. Mooring Analysis… Catenary Shape • Deployed wire length • Initial tension in the wire • Load on Anchor • Location and size of DP buoys • Load on vessel’s mooring fittings • Safe navigation zone around moored vessel

  12. Mooring Analysis… Complex Field Layout • Limiting Vessel excursion • Distance from pipe lines • Distance from floating bodies • Uneven distribution of spread mooring • Support from Jacket Leg

  13. Mooring Analysis… Stringent Safety Criteria • Effect of different directional weather • Effect of extreme weather condition • Effect of one line damage condition • Limitation to excursion • Factor of Safety of anchor, line & mooring fittings

  14. Mooring Analysis… Vessel Stabilisation • Limiting vessel roll & pitch motion • Limiting vessel’s heave motion for • Better habitability • Safe operation of gangway, crane etc • Safe platform repair work • Limiting vessel excursion • For position keeping for subsea repair work

  15. Mooring Analysis… Clash Check • Platform to barge safe distance • Anchor to pipe line distance • Across the pipe • Along the pipe • Mooring line to subsea pipe distance • Line to line distance in cross mooring • Distance from platform helideck or flare

  16. Mooring Analysis… Usage of DP Buoys • DP Buoy parameters for effective lifting of mooring line • Location • Capacity or size • Buoy chain length • Catenary shape with effect of DP buoys • Optimum usage of DP buoys

  17. Mooring Analysis… Limiting Weather • Analysis with extreme weather condition • Derivation limiting weather condition for safe working condition • Contingency plan beyond limiting weather

  18. Mooring Analysis… Relocation Analysis • Transient Analysis for relocating the vessel • Line tension and catenary for relocation operation • Weather condition for safe relocation operation

  19. THANK YOU vedam@vedamindia.com @linkd.in/VedamDes @VedamDesign

More Related