1 / 7

Machine status

Machine status. Status - overview. Tue Jan 4 beginning”2 weeks” ramp-up Tue Jan 11 beginning of phyisics (eve) Tue Jan 18 < 1 week into physics (data up to Monday morning 5:30am). Total from January 11 (nbarn-1) Phenix: 1.38 STAR: 1.38 Brahms: 0.64 Phobos: 0.52.

jlin
Télécharger la présentation

Machine status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Machine status

  2. Status - overview Tue Jan 4 beginning”2 weeks” ramp-up Tue Jan 11beginning of phyisics (eve) Tue Jan 18 <1 week into physics (data up to Monday morning 5:30am) Total from January 11 (nbarn-1) Phenix: 1.38 STAR: 1.38 Brahms: 0.64 Phobos: 0.52

  3. Intensity/collisions – Week 1 best 45 43 34 37 37 31 access 28 28 28 28 28 28 37

  4. Week 1 – best store (31x31 4.5e9) 5904 – Sunday afternoon

  5. Operations issues • Rates Phenix/Star, Phobos/Brahms (procedure for phenix steering) • Reduce time between stores data, revisitoptimum store lengths? • Gap cleaning (no cleaning or cleaning • Nominal intensity – reproducibility (better with AGS, and low intensity interlock) • Transmission – reproducibility (auto-orbit correction, + regular re-tuning on ramp) • Ramp check/maintenance every morning (by day shift leader) • Use of configuration page

  6. Luminosity development Ramp/store parameters now: 37x37 4.5 e9 limitations Pressure rises • Phobos PR with 43x43 • transition pressure rise atwarm section 4 o’clock with 45x45 Losses at transition Transverse Emittance Background  not yet Beam-beam  not yet Luminosity development • Increase bunch intensity 4.56-7e9 Transition optimization for bunch intensity>4.5e9 Emittance measurement, control (injectors, emittance growth RHIC) • Re-try Increase number of bunches to 45-55 • IR correction, yellow • Common cavities • Test of different working point (ramp/store)

  7. Back from access Monday-Tuesday - many problems • AGS main magnet and PS • ODH alarms • Repeated quenches • RF cavity tuner failures ………..impact on luminosity clear Recover from access owl today: • Support to operation (Greg, Todd…) • Ramp maintenance (transmission) • Revert to ramp/store 5904(Sunday- Phobos B)

More Related