Point avancement palonniers

Point avancement palonniers. Réparation tables TAX 10-2-2012. Crochet motorisé double. - Livraison structure prévue S7/8 - Crochets motorisés prêts - Montage final test S8. Crochet motorisé simple. Prêt. Blocage rotation crochet. Prêt. Palonnier levage bloc toit avec champignons.

joshwa
Télécharger la présentation

Point avancement palonniers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Point avancement palonniers Réparation tables TAX 10-2-2012 JL GRENARD EN-HE

  2. Crochet motorisé double - Livraison structure prévue S7/8 - Crochets motorisés prêts - Montage final test S8 JL GRENARD EN-HE

  3. Crochet motorisé simple Prêt JL GRENARD EN-HE

  4. Blocage rotation crochet Prêt JL GRENARD EN-HE

  5. Palonnier levage bloc toit avec champignons • Commande sortie le 9-02-2012 • Délais 6-7 semaines JL GRENARD EN-HE

  6. Champignons Livraison S9 de 24 champignons Reste a dessiner un gabarit pour s’assurer de l’entraxe JL GRENARD EN-HE