An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US Cogeneration Overview January 2009

  2. Summary • Part of NA Refining SPU • 3 Operating Facilities • South Houston Green Power, Texas City, Texas • Whiting Clean Energy, Whiting, Indiana • Watson Cogeneration, Carson, California • 250 MW Steam Turbine Project in Construction – SHGP • Early Development of 5th Gas Turbine Train – Watson • Centralized Support, Houston, Texas • HSSE, technical, commercial, regulatory compliance

  3. South Houston Green Power • 100% owned and operated by BP • 735 MW Electric Capacity • 4.6 MMlb/hr Steam Capacity • Two Facilities • GP2 – 2004 • 3 GE 7FA CTGs with HRSGs • 100 MW STG • Power 4 – 1984 • 2 GE 7EA CTGs with HRSGs • 35 MW STG • 275 klb/hr Package Boiler • Energy Sales • Refinery • 2.2MMlb/hr Steam • 305 MW Electricity • Tolling Agreement with BP Energy • Fuel • Natural Gas – BPE • Refinery Fuel Gas

  4. STG805 Project • 250 MW STG Expansion for SHGP • $133MM CapEx • Construction Complete, Current Lay Up • Commissioning in 2009 • Rationale • Operational flexibility • Increase refinery fuel gas sink • Ends steam venting (~400klb/hr + most upsets) • Removes fuel gas constraints to refinery operations • Increase BPE trading positions • Provides new power peaking capacity • Decouples electricity and steam • Stand-alone power generation during major refinery upsets • Unlocks MWs from existing generation • Increases value from dispatch certainty

  5. Whiting Clean Energy • Configuration: 2 x 1 GE7FA Combined Cycle Cogen • Power: 76 to 525 MW (560 Max) • Steam: 0 to 1,100 kpph @ 1300 psi • Fuel: Natural Gas: (27 to 66 kSCFD) supplied by BP Canada • COD: April 7, 2002 • Ownership: 100% BP • Operations: O&M Agreement with GE, running through 2022, covers both plant operations and maintenance and long-term maintenance of the GTs. • WCE employs 32 people (2 BPAE, 20 GE and 10 additional miscellaneous contractors). • WBU supplies treated water to a WCE owned demineralized water treatment plant, which is operated and maintained under a separate contract with Siemens. • Commercial: • Steam: Up to 1100 kpph sold to WBU under a new SSA. • Power: All energy and capacity marketed by BP Energy under a new EMA into the merchant Midwest ISO.

  6. Watson Cogeneration • Capacity (MW) – 420 MW nominal Cogeneration facility that is a Qualifying Facility (QF) under PURPA • Location: Carson, CA at the BP Carson Refinery • BP interest: 51%; Edison Mission Energy owns 49% Commercial Operation Date (COD): April 6, 1988 • PPAs: • Watson’s sells excess electricity to SoCal Edison. Original 20 year PPA was to expire in early 2008 • CPUC Decision in September 2007 ordered new Standard Offer Contracts • Watson has 5 year agreements for steam, power, and fuel gas with the BP Carson refinery • Supply Agreements: BP Energy supplies Natural Gas through April 09 • Tight Integration with BP Carson Refinery • Operations – steam, power, fuel gas • HSSE – policy, procedure, emergency response • Integrity Management – managed as part of the Carson refinery’s program • Personnel – all WCC employees are seconded from Carson refinery

  7. Watson Reliability Project • Rationale • More reliably meet the Carson refinery’s current steam demand of 1.2 million pounds per hour • Reduce the possibility of refinery upsets due to loss of steam or power • Utilize reclaimed water supply • Joint venture between BP and Edison Mission Group • Fifth train within existing cogeneration facility • GE 7EA gas turbine producing 85 MW • Duct fired HRSG producing up to 659 kpph steam • Best Available Control Technology (DLN, SCR & CO) • Minimal infrastructure required • Submit AFC October 2008 • AFC Approved December 2009 • Begin Construction February 2010 • Startup and Testing October 2011 • Commercial Operation May 2012* *Assumes major equipment is ordered prior to AFC approval; otherwise, targeted COD is January 2013.