1 / 7

BI TB on injector start

BI TB on injector start. BI systems after LS1 Present injector schedule Dry-runs Control system (CO/BI/OP/) Hardware commissioning Machine closed (OP/GS/EPC) allowing RF + magnet + kicker powering Start-up with beam First-line support for BI Expert lists per system Front-ends (generic?)

justin
Télécharger la présentation

BI TB on injector start

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BI TB on injector start • BI systems after LS1 • Present injector schedule • Dry-runs • Control system (CO/BI/OP/) • Hardware commissioning • Machine closed (OP/GS/EPC) allowing RF + magnet + kicker powering • Start-up with beam • First-line support for BI • Expert lists per system • Front-ends (generic?) • Conclusions and follow-up Lars K. Jensen BI/SW

  2. BI systems after LS1 • Main purpose is providing instruments that are operationally integrated • Applications and clients/daemons provided and maintained by BE-OP and BE-CO • Hopefully most design and implementation questions are behind us now (!) • Installation and hardware commissioning on-going • Team-work (HW/SW) to get systems towards state ready for beam Lars K. Jensen BI/SW

  3. Schedule (LN2/PSB/PS) https://espace.cern.ch/be-dep/BEDepartmentalDocuments/BE/2014-injector-schedule_v0.7.pdf BI Lars K. Jensen BI/SW

  4. BE/CO dry-runs #1 EDMS links (C. Dehavay): https://edms.cern.ch/file/1340573/1/dry_run_skeleton_BeCo.pdf https://edms.cern.ch/file/1340573/1/Dry_Run_ID.pdf BI (PSB): Week starting Monday 07-Apr-2014 BI (CPS): Week starting Monday 19-Apr-2014 BI (LEIR): Week starting Monday Lars K. Jensen BI/SW

  5. Dry-runs • Many (!) changes to control system during LS1 (problems!) • BE-CO organising dry-runs (worries) • What can be tested? • Control system (timing, network) • OP applications (‘noise’ traces/values) • Logging (timber) • Goals: resolving integration issues and understanding how BI systems are used • Prerequisites • Power in racks and timing • All electronics installed and connected • Software devices configured and running • Who? • BI hardware and software experts with OP/ABP members • Keep track? • Produce check-list for each system identifying what works and not! Lars K. Jensen BI/SW

  6. Start-up with beam • How do we handle it ? • Stick to ‘best effort’ effort • Presence in the CCC/PS (working hours) • First-line support for BI • No CO piquet after LS1 • Organise BE/BI front-end team? • Training by BE/BI and BE/CO • Access to BE/CO spare room Lars K. Jensen BI/SW

  7. Conclusions and follow-up • IEFC meeting foreseen late February to discuss status after LS1 • Instrument responsible to finalise installation and connection by early March • How do we best communicate changes to OP/CO/ABP? • Document which systems changed and not • Dry-runs seen as necessary step to ensure operational integration of BI systems • Resolve issues with BI front-ends and OP/CO applications/clients • Instrument responsible to produce checklist • Performance of BI systems after LS1 will affect our reputation • Permanent presence in CCC during start-up periods? • LN2, PSB, PS Lars K. Jensen BI/SW

More Related