An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILC Crab Cavity Collaboration • Cockcroft Institute : • Richard Carter (Lancaster University) • Amos Dexter (Lancaster University) • Graeme Burt (Lancaster University) • Imran Tahir (Lancaster University) • Philippe Goudket (ASTeC) • Peter McIntosh (ASTeC) • Alex Kalinin (ASTeC) • Carl Beard (ASTeC) • Lili Ma (ASTeC) • Roger Jones (Manchester University) • FNAL • Leo Bellantoni • Mike Church • Tim Koeth • Timergali Khabiboulline • Nikolay Solyak • SLAC • Chris Adolphson • Kwok Ko • Zenghai Li • Cho Ng LC-ABD plenary April 2007

  2. Crab System Development FY04-07 (LC-ABD1 UK) • Initial study of a proposed ILC crab cavity solution has involved the design/simulation, and subsequent low power testing (i.e. without beam) of suitable cavity models. • Wakefield budget identified and coupler requirements • specified. • The phase control stability requirements have been defined for 14 mR and a prototype digital DSP/FPGA • LLRF system developed (tests expected in Q2 2007). LC-ABD plenary April 2007

  3. FY07-10 (LC-ABD2) PPARC (STFC from Apr 1st) have committed to a constrained 3-year funding plan: – Crab cavity has survived at half funding! – Significant funding profile implications. • FY07-10 (LC-ABD2) funding can facilitate fabrication of a SRF crab cavity (incl. ancillaries) BUT ….. • UK funding will not allow for: – Cryomodule R&D – High power RF R&D LC-ABD plenary April 2007

  4. FY07-10 (LC-ABD2 UK) • • EDR Priorities: • – Develop suitable coupler designs (CI/FNAL/SLAC): • • Verification by prototyping • – Iterate on optimum cavity geometry design (CI/FNAL/SLAC): • • Verification by prototyping with optimum couplers • – Develop suitable frequency and field orientation tuners (CI/FNAL): • • Verification by prototyping with optimum cavity design • – Develop suitable LLRF phase control system (CI): • • Verification by testing with 2 x SRF single-cell crab cavities (vertical test) • • Verification by testing with 2 x SRF 1.3 GHz TM010 cavities (ERLP @ DL) • – Fabrication of a single SRF crab cavity, incl. couplers and tuners, ready • for cryomodule integration (CI): • • Verification by vertical test qualification LC-ABD plenary April 2007

  5. FY07-10 (US) • • EDR Priorities: • – Develop suitable cryomodule design and integrate cavity string (FNAL): • • Verification by beam tests on ILCTA @ FNAL • – Develop and procure suitable HP RF delivery scheme (CI/FNAL) • • Verification by specification definition and subsequent beam tests on • (ILCTA @ FNAL) • – Fabricate a 2nd crab cavity module and HP RF delivery system (FNAL) • • Verification of complete system performance on ILCTA @ FNAL • • Beam loading effects are critical to the performance of • the crab system and must be evaluated. • • ILCTA availability will drive these deliverables! LC-ABD plenary April 2007

  6. Challenges and Synergies • • LLRF phase and synchronisation stability • • Couplers: • – Input – RF power • – LOM – peak magnetic fields • – SOM – damping • – HOM – fabrication and multipactor • • Tuning • – Field polarisation • • Cryomodule: • – Microphonics rejection LC-ABD plenary April 2007

  7. Milestones • Goal 1. Design build and test Input, HOM, LOM and SOM couplers. • Milestones • 1.1 Apr 08: Coupler designs complete • 1.2 Apr 09: Component prototype testing complete • 1.3 Sep 08: Niobium coupler manufacture complete • 1.4 Apr 09: Integration onto SCRF cavity complete • Goal 2. Phase Control System development • Milestones • 2.1 Sep 07: System simulations complete • 2.2 Apr 08: Hardware manufacture complete • 2.3 Dec 08: Final manufacture and provisional testing complete • Goal 3 Design build and test cavity, couplers and cavity tuners • Milestones • 3.1 Apr 08: Cavity design complete • 3.2 Apr 09: Coupler testing complete • 3.3 Apr 09: Cavity tuner development complete • 3.4 Dec 09: Final manufacture and string assembly complete • 3.5 Mar 10: TDR report complete

  8. Budget (at level funding for 3 years)