1 / 1

Causes of the incident

Safety Alert. No. 11 June 98. Committed to Safety. Danger of Works Underneath Overhead Power Lines. Background During a recent management site visit at the Mina Al Fahal tank farm, the following near miss was identified.

kaili
Télécharger la présentation

Causes of the incident

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safety Alert No. 11 June 98 Committed to Safety Danger of Works Underneath Overhead Power Lines Background During a recent management site visit at the Mina Al Fahal tank farm, the following near miss was identified. “Dumping of material from rockbreaking for tank 110 had been ongoing underneath live 33 kV overhead power cables without the minimum clearance required, putting at risk personnel and equipment”. Last month, a High Potential Incident occurred in Marmul when a beam pump being transported on a flat-bed truck came in contact with a 33 kV overhead line, tripping C, A and Gathering stations. Causes of the incident An investigation of the coastal near miss incident is presently in progress, but it would appear that the cause is non compliance with the approved clearance certificate procedure for work in the vicinity or passage under overhead lines. This is described in the HSE Standards Manual, Chapter 11. The underlying cause is believed to be that insufficient attention was given to the risks related to the dump yard activities while supervision focused on the rock cutting site. Learning Points and Action to Prevent Recurrence From the above near miss incident, the following learning points have been identified which need urgent attention: - The PDO Responsible Supervisor for the work (and NOT the Contractor) shall obtain a clearance certificate from the local PDO Asset Team. The requirement for a PDO clearance certificate remains the same, irrespective of whether the lines belong to a third party (eg MEW). - Where possible, overhead power lines should be made DEAD when work is to be carried out beneath them. If it is not practicable, then strict precautions shall be enforced whilst work is in progress. The safety precautions shall be closely supervised by the Area Operations Electrical representative who shall ensure that a minimum vertical safety clearance of 3.5 meters is maintained at all times. - Prior to starting any work, a full risk assessment of the activities is required in order to confirm that hazards identified in the HSE work plan are correct. Reference to the HSE Standards Manual content has to be made. - The PDO Responsible Supervisor shall pay regular visits at site to get opportunities to identify hazards.

More Related