1 / 8

can struction ®

can struction ®. 2009. The making of Can struction. Canstruction in Melbourne began as a dream of a small group of educational leaders in schools in Bayswater and Boronia, as they went looking for a idea to engage middle year students in a study of maths and science. . Overview.

kalil
Télécharger la présentation

can struction ®

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. canstruction® 2009

  2. The making of Canstruction Canstruction in Melbourne began as a dream of a small group of educational leaders in schools in Bayswater and Boronia, as they went looking for a idea to engage middle year students in a study of maths and science.

  3. Overview • The premise of the project is both simple and complex at the same time. Student teams of 5-9 from grades 5,6,7 and 8 are invited to design and create a canstuction using approximately 1,500 cans. The tricky part is trying to ensure that the design is structurally sound, complies with engineering principals and is beautiful to the eye, The student will have a range of colours and size to choose from. Hopefully it will capture the judges heart and minds.

  4. Awards The six awards that will be given out will be in the following categories: • Canstruction Awards • Best use of Labels • Structural Ingenuity • Best Theme • Juror’s Favourite • 1st Honourable Mention • 2nd Honourable Mention • Educational Awards • Individual Portfolio • Team Portfolio • Launch Review • Animation

  5. Rules • 5 team members can be building at any one time but teams can interchange at anytime • Maximum structure size is 3m wide and 3m deep and 2m high • Teams must provide a sketch or computer image of their structure as well as a estimate of the number of cans involved • Structures must be self supporting we can use cardboard and plywood, • Velcro and double sided tape may be used • High tension rubber bands, nylon string, wire and tiebacks can be used • No glass allowed • No pet food • No alcoholic beverages or soft drink • Cans must be full and not opened with labels intact and legible • Labels may not be covered

  6. Group A • Darcy, Liam, Jam, Dean, Stephanie, Rebecca and Isobelle • Group’s Name: The Canstructionators (Team A) • Our Canstruction: • Roles for the group: • Co-ordinator – Darcy Amos • Sketch up – Isobelle, Rebecca and Darcy • 2D and 3D drawer – Liam and Jam • Photographer – Stephanie • Personal Assistant – Dean • Engineer - Dew

  7. Group B • Chelsea, Vivienne, Dylan, Michael, Tyler, Jack and Jacqueline • Group’s Name: The Canstructors (Team B) • Our Canstruction: • Roles for the group: • Co-ordinator – Chelsea • Sketch up – Michael and Vivienne • 2D and 3D drawer – Tyler and Jacqueline • Photographer - Dylan • Personal Assistant - Jack • Engineer: Shawn

  8. Our Theme for the Project?

More Related