An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ExxonMobil BBS web tool Version June 2011

  2. What has changed • Alert Observations • Project number • Observation time • Unannounced Observations • Field verification and validation process • Reports • Selection criteria • Stewardship reports for AO Validated, active users, AO’s and Questionable items • AO DTR • Layout • Job description added as quality criteria • Near miss • Layout • Actual versus planned closing date • OIMS system reference (ExxonMobil only) • JSA DTR • Button added on 1st level

  3. What has changed – Alert Observations • Project #: • Field added to cluster AO’s per project • Convention • the apro number is to be used for Coteba/Artelia projects • TBD for ABB programs

  4. What has changed – Alert Observations • Time: • Time plus AM/PM indication changed into 24 Hrs clock • Convention • HH:MM format to be used

  5. What has changed – Alert Observations • Unannounced AO: • Field ( Yes/No) added to indicate if the AO was announced or not • Unannounced means that the observer appears on site without giving a heads up or pre-notice to the persons observed • One should strive to maximize the number of unannounced visits

  6. What has changed – Alert Observations • Description of Task & Background Information / Work Conditions: • Importance of this field is raised and it is added on the AO DTR template as a separate item

  7. What has changed – Alert Observations • Questionable Item #: • Field protected from direct input • QI are picked up by the system from Page 2 of the AO • Signature field has been eliminated

  8. What has changed – Alert Observations • Field verification and validation: • In the field follow up and Quality review of the recommendation that were implemented to confirm: • Effectiveness and Sustainability over time • Should be performed 1-3 months after the confirmed implementation date Field Verification and Validation new

  9. What has changed – Alert Observation DTR • Page 2 Positive comments / Questionable items • Split into 2 sections • Page 1 Job description • Added Split new

  10. What has changed – Alert Observation DTR • Field Verification and Validation process • No longer obsolete new Split

  11. What has changed - Reports new

  12. What has changed - Reports • AO Count Report - Vendors working for >1 OSP • Selection of AO’s is now based on the OSP selected in the AO form when completing the AO • In the past the selection was based on default OSP, resulting in incorrect counts • Test vendor has performed 124 AO’s for work ordered by OSP 1 and 6 for work ordered by OSP 2 Test Vendor OSP1 selected Test Vendor Test Vendor OSP2 selected Test Vendor

  13. What has changed - Reports • LPO Validated • Stewardship report to monitor the completion of the field verification and validation (V&V) • Verification and validation takes place 1-3 months after the implementation • Report is general indicator if verification is still required • The AO list gives detail which AO’s need V&V

  14. What has changed - Reports • LPO Validated – continued • The AO list gives detail which AO’s need V&V • Vendors can order by clicking on the “Field Validation completed? “ column in the header

  15. What has changed - Reports • Questionable items per month and YTD • Stewardship report to monitor quality of AO process and indirect also the application of the deeper dive tools Test Vendor Test Vendor

  16. What has changed - Reports • Active users • Stewardship report to manage the User Base • Every vendor should have at least one user that has admin rights, if not, contact ABB or Coteba/Artelia • enables that user to create new users and to change the status to inactive of users that are not longer participating

  17. What has changed – JSA DTR • “Add Default JSA DTR” button • Button added on first JSA DTR level to open blank JSA DTR template new

  18. What has changed – Near Miss • New layout of the Near miss / hazard identification form • more logical flow

  19. What has changed – Near Miss • Added reference to OIMS system (ExxonMobil only) • Added “Actual Completion Date” versus “Expected Completion Date” new new