1 / 4

MEG Collaboration Meeting Feb. 3 rd 2003

9:15 Status in Italy (Alessandro, 10’) Status in Japan (Toshi, 5’) Status at PSI (Stefan, 5’) Beam line (Peter, 15’) COBRA magnet (Wataru, 10’) Drift chamber (Johny, 15’) Positron counter (Genova/Pavia, 10’) 10:25 Coffee 10:35 LXe beam tests (Satoshi, 15’)

kalona
Télécharger la présentation

MEG Collaboration Meeting Feb. 3 rd 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 9:15 Status in Italy (Alessandro, 10’) Status in Japan (Toshi, 5’) Status at PSI (Stefan, 5’) Beam line (Peter, 15’) COBRA magnet (Wataru, 10’) Drift chamber (Johny, 15’) Positron counter (Genova/Pavia, 10’) 10:25 Coffee 10:35 LXe beam tests (Satoshi, 15’) LXe LPT analysis & MC (Giovanni, 15’) LXe refrigeration (Tom, 10’) LXe PMT tests (Franco, 15’) 11:30 Trigger (Marco, 10’) Software (Stefan, 10’) 11:50 Novosibirsk contribution (Boris) Updated Sensitivity Work & cost schedule(update project plan, compare with July’s plan, point out road map) 13:00 Lunch MEG Collaboration MeetingFeb. 3rd 2003

  2. 14:30 Closed meeting of referees 15:00 Short presentations (~15’) with discussion (~15’) Beam tests (P.R. Kettle) LXe part A (S. Mihara) 16:00 Coffee LXe part B (G. Signorelli) COBRA magnet (W. Ootani) Drift chambers (J. Egger) Timing counters (G. Cecchet) Trigger (M. Grassi) Computing (S. Ritt) Work/cost schedule ~19:00 Dinner (Oase) MEG Review Feb. 3rd 2003

  3. Status at PSI • 70 l LXe at PSI, waiting 230 (+500) • Cost Separation • R&D and running: laboratory budget (60k$ for 2003) • Investment: special grant (FoKo) (request 1.3M$ in March) • Spending profile: 2003-2004-2005 (0.4-0.5-0.4) • Running and engineering costs should be included in funding • New member of detector Group (Malte Hildebrandt) • Detector group will do software for XYZ, but not pattern finding/track fitting • Request for 2 PhD students in March, need partners -> sensitivity calculator?

  4. Running and engineering costs • Electrical power (0.15CHF/kWh) per yearonce • Electronics (20kW) 13k • COBRA (250kW) 160k • Beamline solenoid (100kW ?) 65k • Engineering (Mechanics, Electricity, Design, Vacuum), 150k/PY • 6 PY for construction (…2004/5) 900k • 0.3 PY/year for running 45k • Gas/year 5k • Computing • Online cluster 30k • Tapes/year 20k • Offline analysis/year 5k 1.8MCHF 1.3M$ Total (3y running): 939k 930

More Related