1 / 34

The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation (Moderator)

The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation (Moderator). Session Presentations. “San Pablo Rapid”, Jon Twichell “Results of Port Authority’s Busways”, David E. Wohwill, AICP “Implementing BRT: The Results”, John Bonsall

kamea
Télécharger la présentation

The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation (Moderator)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation (Moderator)

  2. Session Presentations • “San Pablo Rapid”, Jon Twichell • “Results of Port Authority’s Busways”, David E. Wohwill, AICP • “Implementing BRT: The Results”, John Bonsall • “A Better Transport for a Better Quality of Living”, Luciano Aimar

  3. David E. Wohlwill, AICP • M.S. Urban and Regional Planning Univ. of Wisconsin • B.A. Environmental Studies and Political Science, Univ. of California • Lead Transit Planner, Port Authority of Allegheny County • New York State DOT, Planning and Programming

  4. Results of Port Authority’s Busways David E. Wohlwill, AICP APTA - TRB Bus Rapid Transit Conference Denver, CO May 6, 2004

  5. Pittsburgh BRT Facilities

  6. Port Authority’s Busways • South Busway – 1977, 4.3 miles • Martin Luther King, Jr. East Busway – 1983, 6.8 miles • West Busway - 2000, 5.0 miles • Martin Luther King, Jr. East Busway Extension- 2003, 2.3 miles • Total length of busways is 18.4 miles

  7. South Busway

  8. South Busway • First exclusive transit facility for buses not in a highway • Oldest busway in North America • Links Downtown with Pittsburgh’s southern neighborhoods and suburbs • Allows buses to bypass severe congestion on Liberty Avenue, Route 51, Liberty Tunnel and Liberty Bridge

  9. Martin Luther King, Jr. East Busway

  10. Martin Luther King, Jr. East Busway • Links downtown Pittsburgh and Oakland with Pittsburgh’s eastern neighborhoods and suburbs • Allows buses to bypass severe congestion on Parkway East and other arterials and local streets • Port Authority’s busiest BRT facility

  11. E. Busway Extension Opened 6/03

  12. West Busway

  13. West Busway • Links Downtown with Pittsburgh’s western neighborhoods and suburbs • Facilitates service to Pittsburgh International Airport • Allows buses to bypass severe congestion on Parkway West

  14. Busway Results

  15. Travel Time Savings • South Busway – 20 - 30 minutes • Original East Busway • Downtown to Wilkinsburg – 34 minutes • Oakland to Wilkinsburg – 25 minutes • East Busway with Extension • Downtown to Swissvale – 6 minutes • Oakland to Swissvale – 15 minutes • West Busway – 20 minutes

  16. Ridership Trends

  17. Current Ridership (Oct. 2003) • South Busway – 11,000 • East Busway – 25,000 • West Busway – 8,100

  18. Average O & M Costs per Rider (FY 1995 Data) • South Busway - $1.03 • East Busway - $.95 • Remainder of Bus System - $2.55 • Light Rail System - $3.22

  19. Development Impacts

  20. Development 1983-1996 • 54 developments • Fair market value of $302 Million • New construction and renovation of existing buildings • Retail, office and residential uses most common

  21. Residential Development Linked to a Station

  22. Reuse of an Industrial Building

  23. Medical Professional Building

  24. Redeveloped Railroad Station

  25. Development since 1996 • Development continues to occur • Another $203 million completed • Additional development under construction or being planned

  26. West Busway DevelopmentCarnegie Borough Bldg. - Carnegie Station

  27. Lessons Learned

  28. Operations & Ridership • Significant travel time savings in heavily congested corridors achieved • 1995 O & M cost data indicate substantial savings per passenger compared to the rest of the bus system • Ridership on East Busway has been stable despite overall system decline

  29. Development Impacts • The East Busway and its landscaping were major physical improvements in the corridor • $302 million in development 1983-1996 • Estimated $203 million occurring since 1996 • $505 million to date and more underway • This is a magnitude of investment comparable to development levels observed along rail lines in other cities.

  30. TOD Issues • Consider TOD early in planning • TOD has not fully realized its potential along East Busway • A number of developments are transit-adjacent, but not transit-oriented

  31. Park-and-Ride • Important to provide sufficient number of PNR spaces • Coordination with communities involved almost as much effort for PNR as for the West Busway itself

  32. Image • Image is Critical • Stations on Original East Busway Rebuilt

  33. Design Treatments Enhance Appearance of BRT Guideways – West Busway Berry Street Tunnel

  34. Allow for Future Stations on BRT Facility