1 / 29

Falcon Center for Health, Education and Wellness University of Wisconsin – River Falls Scoping Meeting

Falcon Center for Health, Education and Wellness University of Wisconsin-River Falls Environmental Impact Statement Scoping Meeting DFD Project #11A1E March 14, 2013. Falcon Center for Health, Education and Wellness University of Wisconsin – River Falls Scoping Meeting. Meeting Agenda

kassia
Télécharger la présentation

Falcon Center for Health, Education and Wellness University of Wisconsin – River Falls Scoping Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Falcon Center for Health, Education and WellnessUniversity of Wisconsin-River FallsEnvironmental Impact StatementScoping MeetingDFD Project #11A1EMarch 14, 2013

  2. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Meeting Agenda Introduction WEPA Process Project Description and Schedule Scoping Comment Period Closing Comments

  3. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Introduction Welcome/Introductions Project team members in attendance Attendance sheet, written comment sheet Public Notices in The Student Voice and in River Falls Journal on February 28. E-mail and/or hard copy letters distributed February 15. http://www.cornerstoneeg.com/uwrf-falcon-center/ Meeting will be recorded and minutes developed

  4. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Meeting Agenda Introduction WEPA Process Project Description and Schedule Scoping Comment Period Closing Comments

  5. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Wisconsin Environmental Policy Act (WEPA) Process WEPA – 1971 and UW BOR Resolution 1981 Purpose – Evaluate environmental impacts of project Type I – Environmental Impact Statement Identifies and presents publically impacts, solicits public comments and prevents uninformed decisions Requires 3 public meetings, public available reports and a Record of Decision

  6. Scoping Letter – February 15, 2013 Scoping Meeting – March 14, 2013 Release Draft EIS Report – July 1, 2013 (Begins 45-day Comment Period) Draft EIS Public Meeting – August 14 , 2013 (End 45-day Comment Period) Major Steps in EIS Process Release Final EIS Report – September 5, 2013 (Begins 30-day Comment Period) Final EIS Hearing – October 4, 2013 (Ends 30-day Comment Period) Record of Decision – October 10, 2013 (Ends 30-day Comment Period)

  7. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Wisconsin Environmental Policy Act (WEPA) Process Draft and Final EIS hard-copies will be made available at: River Falls Public Library (Union Street) Chalmer Davee Library Reference Download from Cornerstone’s website: http://www.cornerstoneeg.com/uwrf-falcon-center/

  8. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Meeting Agenda Introduction WEPA Process Project Description and Schedule Scoping Comment Period Closing Comments

  9. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting General Project Description Remodel 14,700 GSF in Hunt Arena and Knowles Center 111,164 ASF/162,300 GSF of new building space as an integrated and unified addition to Hunt Arena and Knowles Physical Education and Recreation Center. Provide plant to serve centralized heating / ventilation needs and cooling load for new space. Utilizing natural gas boilers and ground source heat pump system.

  10. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting General Project Description Secondary access road linking to Cemetery Rd via S. 6th Street (upon completion of separate city project) One artificial athletic multi-purpose field (if budget allows) Phased relocation of existing fields to allow for turf re-establishment

  11. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting General Project Description Demolition of the Karges Center (67,200 GSF) and the Nelson Building (20,500 GSF) Additional parking (total of 720 surface spaces) Remove and relocate utilities as needed LEED Silver certification, or higher

  12. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Estimated Project Budget

  13. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Anticipated Schedule

  14. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Project Design Presented by Raivo Balciunas of Ayres Associates

  15. Existing Site Plan

  16. Proposed Concept-First Floor

  17. Proposed Concept - Mezzanine

  18. Proposed Concept - View from Southwest

  19. Proposed Concept - View from Southwest with Alternate Roof

  20. Proposed Concept - View from Southeast

  21. Proposed Concept – Project Site Plan

  22. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Meeting Agenda Introduction WEPA Process Project Description and Schedule Scoping Comment Period Closing Comments

  23. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Scoping Comment Period Purpose to solicit input from public to identify issues or concerns from the project Comments will be distributed to design team for consideration in the design process May research and give further attention to identified issues in EIS documents Comments, research and design team considerations incorporated into EIS document

  24. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Impacts to be Evaluated Physical Impacts (soil, water) Parking Displacement Utility Impacts (energy consumption) Visual Impacts Economic Impacts (short and long term) Social Impacts Historical and Archaeological

  25. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Scoping Comment Period Scoping period (15 days) complete tonight Oral and written comments received during scoping process incorporated into Draft EIS Will accept comments for Draft EIS through May 17, 2013 Oral comments recorded Open for Comments

  26. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Meeting Agenda Introduction WEPA Process Project Description and Schedule Scoping Comment Period Closing Comments

  27. Falcon Center for Health, Education and WellnessUniversity of Wisconsin – River FallsScoping Meeting Comments received tonight will be considered for evaluation in Draft EIS Anticipated Draft EIS release date: July 1, 2013 Anticipated Draft EIS Public Meeting date: August 14, 2013 Additional Information: Ben Peotter Cornerstone Environmental Group 8413 Excelsior Drive, Suite 160 Madison, WI 53717 Ben.Peotter@Cornerstoneeg.com Project Website: http://www.cornerstoneeg.com/uwrf-falcon-center/

More Related