1 / 7

PERHITUNGAN HARGA SATUAN PEKERJAAN

PERHITUNGAN HARGA SATUAN PEKERJAAN. S0802 -Rencana Anggaran Biaya Pertemuan 5 Ir. Dwi Dinariana,MT. PERHITUNGAN HARGA SATUAN . PERHITUNGAN HARGA SATUAN PEK. BETON. Ada 2 jenis beton Beton Bertulang Beton Tidak Bertulang Klasifikasi Beton : Beton Konvensional Beton Pracetak

kat
Télécharger la présentation

PERHITUNGAN HARGA SATUAN PEKERJAAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PERHITUNGAN HARGA SATUAN PEKERJAAN S0802-Rencana Anggaran Biaya Pertemuan 5 Ir. Dwi Dinariana,MT

  2. PERHITUNGAN HARGA SATUAN

  3. PERHITUNGAN HARGA SATUAN PEK. BETON • Ada 2 jenis beton • Beton Bertulang • Beton Tidak Bertulang • Klasifikasi Beton : • Beton Konvensional • Beton Pracetak • Beton Komposit • Beton Tegangan Tinggi • Ultimate Strength Design • Pre Stressed Concrete (Beton Pratekan) • Pneumatic Concrete (Beto Tekan Udara) u/ perbaikan retak/sedikit pecah

  4. ANALISA HARGA SATUAN BETON BERTULANG • Analisa Harga Satuan Beton Bertulang terdiri dari : • Beton • Bahan Beton • Upah Kerja Beton • Besi Beton • Bahan Besi Beton • Upah Besi Beton • Bekisting • Bahan Bekisting • Upah Kerja Bekisting

  5. Mis : • Cari Analisa Harga Satuan Beton Bertulang (Sloof 15/20) 1 m3 1:2:3 dengan dimensi tulangan 4ø8 sengkang ø6 150-200 • Dimana : • Volume beton = 1 m3 • Besi Beton = 82,4982 kg • Bekisting = 13,332 m2

  6. ANALISA DASAR YANG DIBUTUHKAN

  7. ANALISA HARGA SATUAN BETON BERTULANG 1:2:3 (Sloof 15/20)

More Related