Outline. Board Direction Tasks Completed Recommendation. Board Direction. Approved motion from December 2008 Conceptually approve the 60% plans with the traffic calming Widen path to 8 feet and move to edge of right-of-way where possible

kendall
Télécharger la présentation

Outline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Outline • Board Direction • Tasks Completed • Recommendation

  2. Board Direction • Approved motion from December 2008 • Conceptually approve the 60% plans with the traffic calming • Widen path to 8 feet and move to edge of right-of-way where possible • Discuss with GRU the feasibility of underground utilities • Insure no additional stormwater impacts • Refer issue to Bicycle/Pedestrian Advisory Board

  3. Board Direction • Additional Requests • 3 Chicane model • 91st Street crash data • Leon County canopy road program

  4. Path Widening/Relocation • Tasks Completed • Horticulturist and Arborist reviewed relocation • Field meeting with Commissioner Byerly • Meeting with affected property owners • Results • Relocated path south of NW 1st Place to back of right-of-way • Meandered path north of NW 1st Place and widened to the east (toward the road)

  5. Path Widening/Relocation

  6. Path Widening/Relocation

  7. Path Widening/Relocation • Benefits • Additional space for landscaping • Additional stormwater storage within the swales • Issues • Requires relocation of approximately 1600’ of fence • Reconstruction of path • Some underbrush removal • Potential adverse impacts to root systems

  8. Underground Utility Discussion • Tasks Completed • Meeting with GRU (February 2nd) • Utility coordination meeting (February 16th) • Discussion • Life-cycle cost of underground vs. overhead • Types and locations of utilities along 91st • Potential impacts • Costs

  9. Underground Utility Discussion • Benefits • Better conditions for canopy development • Issues: • Life-cycle: underground is cost-prohibitive • Location: Cox Communications co-located on poles; AT&T and GRU water/waste water underground • Impacts • GRU easement requirements • Existing underground utilities • Trees • Costs (only for main line): GRU $1,000,000; Cox $450,000

  10. Underground Utility Discussion • County pays • Approximately $1,450,000 for main line • Plus cost of connections to homes • County cannot force utilities to move existing facilities underground

  11. Stormwater Impacts • Tasks Completed • Kimley-Horn and Associates completed a drainage analysis of basin • Analysis was performed based on 60% plans as presented • 8’ wide multi-use path • Proposed traffic calming features

  12. Stormwater Impacts – Pre-Construction

  13. Stormwater Impacts – Post-Construction

  14. Bicycle/Pedestrian Advisory Board • Tasks Completed • Presented to BPAB on February 24, 2009 • Results • BPAB recommended leaving path in place and widen to 8’ where possible • Same recommendation as Citizen’s Advisory Committee

  15. Bicycle/Pedestrian Advisory Board • Benefits • Less likelihood of impacting trees as compared to relocation • Issues • Requires reconstruction of sidewalk • Possible decrease in storage capacity of swales

  16. Chicane Only Model

  17. 3 Chicane Model Chicane #1

  18. 3 Chicane Model Chicane #2

  19. 3 Chicane Model Chicane #3

  20. Chicanes Only Model • Chicanes only model is not a viable option • Driveway conflicts • Sight distance issues

  21. Crash History on 91st Street • Reviewed crash history • Data from 2002-2007 • Standard practice to review crash history prior to beginning resurfacing, restoration and rehabilitation projects • May indicate problems with existing conditions

  22. Crash History on 91st Street

  23. Crash History on 91st Street

  24. Summary of Speed Study

  25. Relationship of Speeds & Crash Rate • Crash rates are lowest when posted speeds are at 85th percentile

  26. Leon County Canopy Road Information • Nine designated scenic roads • Mix of arterial, collector and local roads • Speed limits range from 30mph to 55mph • Traffic volumes range from 2,000 ADT to 7,000 ADT • Mix of driving surfaces

  27. Recommendation • Approve the 60% design plans as presented which include widening the existing multi-use path to 8’ and relocating the path to the edge of the right-of-way where feasible. • Direct staff to complete plans.