1 / 17

2) Headends and Hubs

2) Headends and Hubs. Photovoltaic Power System for DC loads Extra High Efficiency. Photovoltaic Power System “PVPS” PVPS is a solar/power bay system that supplies DC power directly to the battery bank and DC load. Grid-tied, but continues to provide power in the event of an outage.

kevyn
Télécharger la présentation

2) Headends and Hubs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2) Headends and Hubs

  2. Photovoltaic Power System for DC loads Extra High Efficiency • Photovoltaic Power System “PVPS” • PVPS is a solar/power bay system that supplies DC power directly to the battery bank and DC load. • Grid-tied, but continues to provide power in the event of an outage. • Fully integrated. • Ready for rapid deployment. • Ideal for critical loads

  3. Hybrid Power Systems - “HPS” • Hybrid Power System “HPS” • For maximum power reliability, incorporates: • Solar • Battery • And/or generator • And/or wind turbine • Designed for larger loads providing DC and/or AC output • Custom Engineering Customer AC Loads PV Array Customer DC Loads Wind Turbine(s) Alpha Group DC Power Plant: Charge Controller, Cordex (Rectifier and Inverter optional) Generator(s) Battery Bank

  4. Case Study: Leading European MSO • Purchased over 300kw of PV power from Alpha • 80% went into Office installations • Corporate and Sales • 18% went into Headend and Hub site locations but using AC grid tie power to take advantage of high European feed in tariffs • 2% Experimented with low load network powering locations. Was very hard to impossible to find locations to make this happen

  5. 3) Network

  6. Applying solar down in the network • To go fully off grid: • Pricey: $18,000+ to go full off grid and not connect to the utility, Difficult to find enough space, rights of way • Vulnerable to theft • Lots of batteries • Can be used to defer power costs • Can start to shed load for 1500$ on up • Projects in europe with one or four panels and a small charge controller • Panel installation permissions were the biggest issue • Can have a decent payback

  7. Hybrid CableUPS in a Fibernode Power Enclosure (FPE) Nodes

  8. Sell Back Buy

  9. The Choices: High Capital Cost Contract with the utility to install distribution High O&M Cost LP Generator with regular maintenance Best Life Cycle Cost Solar power system with generator backup Alpha’s HPS arrives at the site fully tested and ready for deployment. Case Study: Remote Cell or Microwave sites: Sierra Vista, AZ Cell Repeater

  10. Case Study: Low power transmission sites: Cisco Wireless Mobility Alpha Technologies Model number MPS30-48CSL is a 48VDC Uninterruptible Power Supply Supporting Cisco Aironet 1500 radios for Outdoor Mesh Networks

  11. Payback Analyses for a Photovoltaic Power System in the Caribbean

  12. System Description • $100,000 USD Estimated Upfront Cost for a 26.0 kW Alpha PVPS • Roof-Mount Racking; PV Array Tilted at a 10° Angle due South • Produces ~50,000 kWhs annually • Installation, taxes, and shipping charges not included in estimated cost

  13. Exception and Clarifications on Study • Weather data used in analysis was from Aruba. • Used various electricity rates in $0.10 increments, with an annual 4.0% cost /kWh escalation . • Assumed system would be installed at the beginning of the year. • Output degradation from the modules was estimated to be 0.5% annually. • NPV was calculated with a 7.0% discount rate over 20 years. • IRR was calculated over 20 years. • Following graphs show simple payback (revenue and costs per year) pre-taxed. Does not take inflation into account. • No costs due to taxes, shipping, installation or maintenance were included in analysis.

  14. Payback Models with Varying Electricity Rates

  15. Thank you for your time.

More Related