An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Concrete Construction

  2. 3 major costs of concrete • Formwork costs including labor, equipment, and materials • Cost of reinforcing steel and placement • Concrete materials, equipment, and labor for placing, curing, and finishing • F11-1

  3. Cast in Place • Traditional method • Allows concrete to be formed to site conditions • Used on most construction sites for structural members • Concrete placed in forms to cure • Forms removed after enough strength in concrete to support self and additional construction loads

  4. Cast in Place • Walls and wall footings • Need to avoid voids and separation of materials due to large fall • Special care for areas under windows , pipe chases and other formwork installed inside wall forms • Can pump concrete from bottom of form to get rid of voids

  5. Cast in Place • Floors and roofs • One way slab – only supported in one direction F 11-3 • Slab and beam • Slab, beam & girder • Outside beam is called spandrel beam • Columns poured before slabs – shrinkage • If poured same time could stress floors and beams due to shrinkage

  6. Cast in Place • Floors and roofs • One way slab – only supported in one direction F 11-3 • Slab and beam • Slab, beam & girder • Outside beam is called spandrel beam • Two directional slabs (waffles) provide support in two perpendicular directions • supported by columns

  7. Cast in Place • 2 way • Basically joists in both directions • Flat slabs • Supported directly by columns • Uses column capitals to distribute load over larger area • More reinforcement needed to carry loads to columns • F 11-6

  8. Precast concrete • Cast into desired shape at plant and moved to site • Controlled environment -> better finish and quality • All prestressed and pretensioned members are precast • F 11-7, 11-8

  9. Precast concrete • Types • Joists and purlins F 11-7 • Roof and floor panels • Flat 1-4” thick, 15 – 32” wide, 4-10’ long • hollow core 4 – 12” thick, 4-8’ wide, 15 – 50’ long • tee, double tee 4-12’ wide span 12 – 100 feet • channel slabs 2 – 5 ‘ wide, 15-50 ‘ long • F11-8

  10. Precast concrete • Types • Walls • Usually curtain wall construction panels fit between structural components to form wall • But used in tilt up construction • Panels cast horizontally on existing slab and tilted upright • F 11-9

  11. Prestressed Concrete • Initial compression load applied to concrete • Places entire beam in compression • Makes beam stronger since more force is required to induce a tension component • Reduces deflection • F11-10

  12. Prestressed Concrete • 2 ways to do • Pretension – place prestressing material in tension in the form while concrete is poured • Once concrete hardened remove tension • Bond between steel and concrete keeps steel in place • Post tensioning – steel is placed inside a plastic tube during concrete pouring • Upon placement steel is tensioned and the steel is mechanically anchored to the concrete at each end • Load is removed and steel cut flush

  13. Architectural Concrete • Appearance effects • Shape, size, texture, and color • F 11-12 & 11-13

  14. Concrete Construction Practices • Transporting and Hauling • Need to avoid segregation of materials in concrete • Wheelbarrows, buggies, chutes, pumps, conveyors, buckets, trucks • Placing and consolidating • Need to make sure form surfaces and bracing is right before placing concrete

  15. Placing • Forms must be coated in oil to allow removal • If placing concrete on ground – must moisten ground • If pouring on top of cured concrete must place bonding agent between pours • Shotcrete (gunite) – concrete placed pneumatically • Consolidation – removing air voids • vibration

  16. Finishing & Curing • Finishing – bring surface of concrete to its final position and surface texture • Screeding – striking off excess concrete • Floating – smoothes and compacts concrete imbeds aggregates • Troweling – compacts surface F 11-16 • Brooming – surface texture

  17. Curing • To get good concrete must cure properly • Moisture and temperature are key • Moisture – wet straw or burlap, curing compounds • Vacuum dewatering – mat placed on concrete • Vacuum applied to mat – takes out excess water • Lower W/C ratio -> denser mix

  18. Hot weather Concreting • Curing accelerates when concrete temp above 50 – 60 F • How to lower temp • Use cold water in mix • Cool aggregates before mixing • Use Type IV (low heat cement) • Add a retarder • Decrease max time to discharge to 1 hour

  19. Cold weather Concreting • Concrete should not freeze for 1st 24 hours • Min temp for placement is 50F • Use type III (hi early strength) • Use accelerator • Heat water and aggregates before mixing • Use vented heaters to keep concrete warm