1 / 3

LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA

LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA. 7 00. 2 00. 600. 600. Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks / row Shielding area 1200 x 700 mm2  7 x 12 = 84 iron blocks

kimn
Télécharger la présentation

LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA 700 200 600 600 Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks / row Shielding area 1200 x 700 mm2  7 x 12 = 84 iron blocks Shielding area 4800 x 700 mm2  4 x 84 = 336 iron blocks Weight of 1 iron brick  15 kg Total weight of shield  5040 kg D.LACARRERE

  2. ADDITIONNAL IRON SHIELD BEHIND MUON CHAMBERS M5 2400 BELT (*) 700 IRON BLOCKS MF4 NO SCALE (*) Belt in order to fix the iron blocks – not yet defined D.LACARRERE

  3. STATUS 5 DECEMBER 2011 (in brief) • IRON BLOCKS : ~ 400 blocks available (250 at Pit2 + 150 at Pit8) ; non “TFA” • - RP CHECK : Ask for authorization to blast the blocks – corroded surfaces - on going • SURFACE TREATMENT (in preparation) : • a) blasting with special sand (garnet 30-60 mesh) – DAI 479609 08/11/2011 • b) painting before x-mas – drying during Christmas break. • SCHEDULE : • 1 - Blasting week 12/12/2011 • 2 - Painting week 19/12/2011 • 3 - Installation top of MF4 – mid-January 2012 (to be specified by Muon Group) D.LACARRERE