Improving track design to reduce life cycle costs

Improving track design to reduce life cycle costs. А .J. Abdurashitov Branch Manager of OJSC VNIIZHT , Ph.D. VNIIZhT (OJSC “Russian Railway Transport Research Institute”). General states.

klaus
Télécharger la présentation

Improving track design to reduce life cycle costs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improving track design to reduce life cycle costs А.J. Abdurashitov Branch Manager of OJSC VNIIZHT, Ph.D. VNIIZhT (OJSC “Russian Railway Transport Research Institute”)

  2. General states The strategy of development of railway transport in the Russian Federation up to 2030 envisages increasing amount of freight traffic by about 40%. One of the objectives is to bring between overhauls tonnage by 2015 to 1.5 billion tonnes gross, and by 2030 to 2.5 billion tonnes gross. To achieve these parameters is necessary to develop more sophisticated design elements of the track’s permanent way. When choosing the design of the way the main criteria are the cost and duration of the life cycle. 2 | Improving track design to reduce life cycle costs| 16.10.12 | VNIIZhT

  3. Scheduled for future track network of OJSC "Russian Railways" with heavy haul, fast and high-speed traffic New high-speed tracks for passenger traffic with speeds up to: 400km/h Combined traffic high-speed tracks with trains speed up to: Passenger from160to200km/h Freightup to90km/h Fast tracks with combined traffic, including heavy haul, with trains speed: Passenger - 250km/h Freight- 90km/h 3| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  4. Comparison of change in length of track with continuous welded rails by year on Siberian and Far Eastern railways and on the network as a whole The area in which continuous welded rails has been laid is increasing and it currently accounts for 67.1% of the total length of railway network’s main lines. Percentage of total length of railway lines Russian Railways network Siberia and Far East Years 4| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  5. Operational conditions on Russian railways The Russian Federation is characterised by a variety of building and operating conditions Depending on their geographic and climatic location, construction zones are defined: - according to the relief conditions – from plains to mountainous areas - according to geological factors – from swampy land to rock foundations - according to type of climate – from subtropical to Arctic. Maximum daily temperature range: 40°С Maximum annual temperature range: 120°С Number of days per year with temperature < 0°С: 221.1. Occurrence of snowstorms and snowdrifts. 5| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  6. Analysis of the slab track in testing facility of OJSC "VNIIZhT" in Scherbinka Section of slab track RHEDA -2000 andLVT RHEDA-2000 LVT 6| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  7. Distribution of track maintenance major works of the high-speed track sections 7| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  8. Clips for fast and high-speed tracks on the Moscow-St. Petersburg line ARS(8elements) KB(19 elements) • Maintenancecost of • 1 km of track per year: • KB - 1 897 €. • ARS- 375 €. • PANDROL- 0 €. • VOSSLOH- 0 €. Pandrol(8elements) Vossloh(8elements) 8| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  9. Ensure the strength and stability of tracks with continuous welded rails during the life cycle Remote monitoring of the rails with independent measurement systems with function of the track work analysis 9| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  10. Reinforced tracks with continuous welded rails in Siberia Part of the curve with ballast fixed by polymeric binder Sleepers with high shear stability 10| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  11. Sleepers Sh3-K for the curves of small radius with clips ZhBR-65 Testing track section with sleepers Sh3-K with gauge 1530 mm at the Dalnevostochnaya railway R = 246 m Testing track section with sleepers Sh3-K with gauge 1535 mm at the Dalnevostochnaya railway R = 240 m 6 curves of small radius placed in Privolzhskaya railway Wear reduction compared to thewooden sleepers in 2 times 11| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  12. New materials and technologies to strengthen sub-ballast Modeling of the stress-strain state of reinforced track foundation Placing reinforcement cage into the ballast of transition track section 12| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  13. Prevent damage of the rolling stock with ballast particles Polyurethane coating is applied to the surface of the ballast and prevents it from being moved by air wave created by the passage of high-speed trains. The technology of using adhesives in the ballast used on high-speed line Moscow-St. Petersburg 13| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  14. Conclusions • The main criterion in selecting a track design is the cost and the length of the life cycle. • The main track design on Russian railways, including those in Siberian areas, is continuous welded rail on reinforced concrete sleepers. • Railway track in Russia is operated in difficult climatic, engineering and geological conditions which are taken into account in the selection of the parameters for building and fitting track. • The main objective is to reduce costs for the rail clips. This is priority way for cooperation. • Integrated measures have been carried out to lengthen the service life of the rails to 1.5 billion tonnes gross. 14| Improving track design to reduce life cycle costs | 16.10.12 | VNIIZhT

  15. THANK YOU FOR YOUR INTEREST!