1 / 5

SECNAVINST 1850.4 F

SECNAVINST 1850.4 F. Major changes prompting the revision: Enclosure 10 (What you need to know about the Physical Evaluation Board) deleted Death Imminent Processing Memorandum of 23 Dec 2003 from the Under Secretary of Defense 2004 Defense Authorization Act – Child Only Election for SBP

kobe
Télécharger la présentation

SECNAVINST 1850.4 F

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SECNAVINST 1850.4F • Major changes prompting the revision: • Enclosure 10 (What you need to know about the Physical Evaluation Board) deleted • Death Imminent Processing • Memorandum of 23 Dec 2003 from the Under Secretary of Defense • 2004 Defense Authorization Act – Child Only Election for SBP • Formal board consolidation at Bethesda

  2. SECNAVINST 1850.4F • Additional issues with update • DOD Instruction 1332.38 • DOD Instruction 1332.39 CURRENTLY UNDERGOING REVISION

  3. SECNAVINST 1850.4F • Additional changes to be incorporated • Consolidate reserve issues • Possibly have a “Reserve” Enclosure • Guidance on sharing information with Commands • CO’s right to know • Limited Duty Coordinators • Policy on escort orders • PLD changes • Navy members get to pick separation day 30 – 90 days

  4. SECNAVINST 1850.4F • Additional changes to be incorporated • New MANMED Ch 18 • Unfit reconsiderations going away? • Reduce time allowed for completion of Election of Options? • Other changes from field

  5. TIMELINE • Initial Planning Meeting – 22 Jan 04 • Article Leads Assigned – 12 Mar 04 • Input Due From Field – 15 Jun 04 • Revisions Due From Leads – 28 Jun 04 • Coordinating Draft Target – 28 Jul 04 • Final Draft Target – 30 Sep 04 • Final Product Target – 14 Jan 04

More Related