An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bongao DPPBongao, Tawi-tawi Installed capacity – 2 x 544 perkins genset Back-up for pb108, (7.2MW) Peak demand - 2.6 MW (grid total)

  2. Manuk Mangkaw DPPTawi-tawi Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation

  3. Sacol DPPSacol Island, Zamboanga City Installed capacity – 1 x 163 kw perkins Peak demand – 155kw 6 hours operation Plant turn over to NPC SPUG from city government of Zamboanga City

  4. Sibutu DppTawi-tawi Province Installed capacity – 2 x 163 kw perkins Peak demand – 240 kw 6 hours operation

  5. West Simunul DPPTawi-tawi Province Installed capacity – 2 x 54 kw visa, 1 x 260 kw perkins Peak demand – 220 kw 6 hours operation

  6. TANDUBANAK DPPTaunguh, Sibutu Island Unit no. 1, 1 x 280 kw Cummins Gensets Unit no. 2, 1 x 160 kw Cummins Gensets 6 hours operation, peak load 80 kw

  7. Sitangkay DPPTawi-tawi Province Installed capacity – 2 x 280 kw cummins Started commercial operation – August 22, 2009

  8. Basilan DPPIsabela City, Basilan Province Installed capacity – 1 x 1224 kw CKD, 1 x 448 kw CKD Back up units for PB 119, 7.2 MW Rented units 2 x 1000kw, 1 x 600 kw caterpillar units are stationed here. Peak system demand – 6.200 MW

  9. Siasi DppSiasi, Sulu Installed capacity – 2 x 500 kw MAN, 2 x 560kw perkins, 2 x 260 kw perkins Peak demand – 680 kw 20 hours operation

  10. Luuk DPPCamp Andres, Luuk, Sulu Installed capacity – 1 x 175 kw cat, 1 x 54 kw visa Peak demand – 225 kw 6 hours operation

  11. Manuk Mangkaw DPPEast Simunul, Tawi-tawi Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation

  12. Jolo DPPJolo, Sulu Installed capacity – 3 x 1.8 MW daihatsu Peak demand – 4.622 MW 24 hours operation Rented back up 1 x 1000kw, 1 x 1,500kw caterpillar

  13. Mapun DPPCagayan de Tawi-tawi Installed capacity – 2 x 260 kw perkins, 1 x 500 kw MAN Peak demand – 350 kw 10 hours operation

  14. Sibutu DPPSibutu island, Tawi-tawi Installed capacity – 2 x 163 kw perkins Peak demand – 240 kw 6 hours operation

  15. Balimbing DPPPanglima Sugala, Bato-bato, Tawi-tawi Installed capacity : 2 x 163 kw Perkins, 2 x 150 kw Cummins 8 hours operation, 5:00pm to 1:00am

  16. Power Barge 108Bongao, Tawi-tawi Installed capacity – 4 x 1.8 MW daihatsu (7.2MW) Peak demand – 2.600 kw 24 hours operation Backed up by land based plant

  17. Power Barge 119Isabela City, Basilan Installed capacity – 4 x 1.8 MW daihatsu (7.2MW) Peak demand – 6.200 MW 24 hours operation Backed up by land based plant and rented units

  18. TANDUBAS DPP

  19. SPUG MINDANAO • Eastern Mindanao Area Total system capacity – 9. 690 KW

  20. Palimbang DPPsultan kudarat Installed capacity – 1 x 54 kw visa Peak demand – 48 kw 6 hours operation

  21. Dinagat DPP (new PH)San Jose, Dinagat Island Installed capacity – 5 x 275kw cumper, 2 x 260kw perkins, 1 x 364kw 1 x 163kw perkins Peak demand – 1.220kw 18 hours operation

  22. Loreto DPPDinagat Island Installed capacity – 2 x 220 kw ckd, 1 x 500 kw MAN Peak demand – 290 kw 8 hours operation

  23. Talicud DppDavao del Norte Installed capacity – 2 x 163 kw perkins Peak demand – 160 kw 10 hours operation

  24. Kalamansig DPPSultan Kudarat Installed capacity – 5 x 260 kw perkins, 1 x 220 kw ckd, Peak demand – 1.800 kw 24 hours operation, backed up by PB 111

  25. Abad Santos DPPCaburan, Davao del Sur Installed capacity – 1 x 163kw perkins, 1 x 260 kw perkins Peak demand – 210 kw 10 hours operation

  26. Balut DPPSarangani, Davao del Sur Installed capacity – 2 x 163 kw perkins Peak demand – 120 kw 8 hours operation

  27. Hikdop DPPHikdop, Surigao del Norte Installed capacity – 2 x 163 kw perkins Peak demand -95 kw 7 hours operation

  28. Power Barge 111Lebak, Sultan Kudarat Installed capacity – 4 x 560 kw perkins Peak demand – grid total 1.800 kw 24 hours operation Back up power of land based plant.

  29. Ninoy Aquino DPPSultan Kudarat Installed capacity – 2 x 163 kw perkins Peak demand – 230 kw 12 hours operation

  30. Thank you courtesy of: PERFORMANCE GROUP OMAR C. ANTOCAN MARVIN L. MADJAD RALPH P. ANTONIO