1 / 17

Drinking Water in Barcelona

Drinking Water in Barcelona. Gabriela Cembrano IRI, CETAQUA. Gabriela Cembrano. Researcher at Institut de Robòtica i Informàtica Industrial (UPC-CSIC) Project Manager at CETAQUA. Before use:. After Use:. Intake. Release to environment. Treatment. Recycling. Treatment/regeneration.

kovit
Télécharger la présentation

Drinking Water in Barcelona

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Drinking Water in Barcelona Gabriela Cembrano IRI, CETAQUA

  2. Gabriela Cembrano Researcher at Institut de Robòtica i Informàtica Industrial (UPC-CSIC) Project Manager at CETAQUA

  3. Before use: After Use: Intake Release to environment Treatment Recycling Treatment/regeneration Transport and Storage Urban drainage Distribution Consumption The Urban Water Cycle

  4. 4 sources of supply Superficial water from Llobregat river Superficial water from Ter river Wells from Besòs river Underground water from Llobregat aquifer 2 WTP’s 1 WTP 1 WTP Desalinated sea water (2009) Water Supply in Barcelona

  5. The WTP at Sant Joan Despí

  6. Treatment Plant processes • Pre-treatment • Clarification • Ozone-carbon treatment • Final disinfection • Membrane filtering (RED, IO)

  7. Limited Supplies for the Barcelona Metropolitan Area Sources Total storage capacity: 612 hm3 Yearly demand: 615 hm3 Barcelona Metropolitan Area Supplies and Demands

  8. Reservoir Capacities Ratio yearly demand/ storage capacity approx 1!

  9. Ter Llobregat Besòs Desalination An Interconnected Network

  10. A complex supply problem Problems of the Barcelona water system: • Semi-arid weather, limited availability • Limited infrastructure, no slackness • Poor water quality in one main supply • Low mineralization in desalinated water • Growing population and demand

  11. The Ter-Llobregat Basin

  12. The SOSTAQUA Project:Developments Towards Sustainabilty in the Urban Water Cycle (2007-10) • Industrial Partners: Agbar, Degremont, Dow Chemical Ibérica, Cementos Molins Industrial, Clabsa, Labaqua, Sener, Solvay, Emuasa, Cric, Canaragua, Auma, Remosa, Amphos 21, Stc, Sineria. • Public Research Institutions: UPC, CSIC, UB, UAB, UVa, UdGUAH, GIRO, CTM, URV, UG, UDC, ULPGC, IQS • 10 research lines in: • Water • Energy • Waste http://www.sostaqua.com

  13. Work lines in SOSTAQUA

  14. SOSTAQUA, Line 4: Optimal management of water supply • Goals: • To design a decision support software tool for real-time water supply management • Techniques: • Real-time control and supervision • Optimization • Simulation

  15. Water Supply Management Goals • Demand-supply balance • Reservoir management • Ecologic flow guarantee in rivers • Flood prevention • Hydroelectric power generation • Acquisition, transport, treatment costs • Combined water quality to users

  16. An example of DSS

  17. Conclusions Water supply in Barcelona involves challenges: • Social • Quality-of-service • Economic • Energetic • Environmental

More Related