An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Appointment Contracts for BIM SMARTBIM Solutions

  2. Measured ROI North America vs. Western Europe McGraw-Hill: The Business Value of BIM in Europe. Smart Market Report. SMARTBIM Solutions

  3. BIM is not just Technology! © SmartBIM Solutions 2011 SMARTBIM Solutions Benedict Wallbank RIBA

  4. Phase 3 Transformation Organisation Supply Chain Collaboration Process BUSINESS ACTIVITIES Technology Design Collaboration TEAM OPERATIONS PROJECT LIFECYCLE WORKFLOW Internal Collaboration Contributing Parties and Utility of Information INTEGRATED DESIGN WORKFLOW Establishing BIM nD BIM 3D BIM INDIVIDUAL REPLICATE 2D CAD Time Phase 2 Effectiveness Phase 1 Efficiency © SmartBIM Solutions 2011 SMARTBIM Solutions CAD Transition: The Challenge of Collaboration

  5. BIM Protocols / Implementation Plans • Building Contracts for BIM. • Professional Indemnity Insurance on BIM projects • Appointment Contracts for BIM • Intellectual Property Rights and Collaborative BIM. SMARTBIM Solutions Key Risks!

  6. Does your Client understand what he is asking for? • Control Client expectations. Don’t oversell the benefits particularly on first BIM projects. • Appointments should detail the scope and objectives of the BIM. • Include a Schedule of BIM Deliverables (programme). (Ensure that you allow for a time overhead on the set up of a first BIM project (particularly 5D).) • Agree where the BIM database is to be located and the security responsibilities thereof. • Appointment Documentation should refer to the drawing up of BIM protocols between contributing parties (this too should be programmed) . © SmartBIM Solutions 2011 SMARTBIM Solutions Appointment Contracts

  7. SMARTBIM Solutions Restructure Fees?

  8. © BIMit Consultancy 2010 Volume Model Environmental Analysis Space Model Element Model Scheme Model Construction Model FIM Model FM Model © ArchiFM © Focchi

  9. AIA Document 202 - 2008 • Your appointment should state the level of detail of the BIM at each work stage. • Note when a record copy of the BIM is required. At each defined work stage as a minimum. (AON recommend weekly copies.) LOD 100 • Define the permissible uses of the BIM at each work stage. When is the BIM itself a construction document? LOD 200 • Define the identity and role of the Information (Model) Manager on collaborative BIM projects. LOD 300 • Charge for all services outside standard scope of works for an architect. LOD 400 • Get your legal advisors and insurers (Brokers) to review and comment upon the appointment before you sign. LOD 500 © SmartBIM Solutions 2011 SMARTBIM Solutions Appointment Contracts

  10. ` Melbourne Convention & Exhibition Centre, Australia A Plenary Group Public Private Partnership Architects: Woods Bagot and NH Archi`tecture • Where sub-contractors are contributing to the BIM a detailed CDP Matrix becomes vital. • Clear definition of construction modelers roles and responsibilities. • If the architect is construction modeling for the contractor, unambiguous agreement of responsibility for these portions of the work must be documented. SMARTBIM Solutions Appointment by the Contractor

  11. Define at the outset what rights your client has to use project information. • Joint rights? • Grant of non exclusive rights to all users for the purpose of the project only? • Use by owners for facilities management? • Use of Data rather than the model itself? © SmartBIM Solutions 2011 SMARTBIM Solutions Intellectual Property Rights

  12. Detail permissible uses of the model. No party to have liability resulting from use of Model beyond uses set out. • If you provide for the re-usage of the BIM ensure that appointment documents allow only for re-usage in exactly the same way / relationship as in the original design. • If IPR rights are not confined to single usage ensure that you are paid more. Your insurers will charge you more! © SmartBIM Solutions 2011 SMARTBIM Solutions Intellectual Property Rights

  13. Document your intent and get acknowledgement from all parties! © SmartBIM Solutions 2011 SMARTBIM Solutions Collaborative BIM Directors Key Rule

  14. Questions? SMARTBIM Solutions