1 / 10

Biomass Heating Network Event 25 th March 2011

Biomass Heating Network Event 25 th March 2011. Jamie Reith BSc (Hons). Background…………. Selection of own boiler:. Researched different makes Different ideas from different countries “BMW versus Ford” Level of sophistication Working examples. Fuel supply –chip vs. pellet?.

kylia
Télécharger la présentation

Biomass Heating Network Event 25 th March 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Biomass Heating Network Event 25th March 2011 Jamie Reith BSc (Hons)

  2. Background…………

  3. Selection of own boiler: • Researched different makes • Different ideas from different countries • “BMW versus Ford” • Level of sophistication • Working examples

  4. Fuel supply –chip vs. pellet? • Self sufficiency • Available buildings • Faster payback • Fully automated system

  5. Practical experience • Back-up system • Use heat-exchangers • Use a buffer tank • Fuel quality • Boiler maintenance

  6. Case study: 50kW log boiler (Netherton of Glenboig, Kippen) • Client keen to handle firewood • Oil boiler retained as backup • Dramatic reduction in heating bills • Biomass chosen in preference to ground source heat pump

  7. Case study:60kW single phase chip boiler (Inchmagrannachan, Dunkeld) • 5m x 5m fuelstore • Heating self catering units and farmhouse • 3000l buffer tank • Running on hardwood chips

  8. Case study:150kW chip boiler with underground reception hopper (Fife Council,Kinghorn Primary School) • 20 cubic metre reception hopper with automatic transfer to internal fuel store • Boiler retro-fitted next to 400kW gas boiler • Fuel contract and service contract

  9. Case study:150kW woodchip with mini District Heating scheme(Blairmore, Perthshire) • Renovation and conversion of old farm steadings • Let holiday cottages • Oil back-up for peace of mind

  10. Questions? Contact: www.woodforwarmth.co.uk

More Related