Small Wind and Solar Systems

Small Wind and Solar Systems. Kristi Robinson Steele-Waseca Cooperative Electric. As of May 10, 2009. 5. 4. 3. 2. 1. Midwest ISO States with Renewable Mandates. 5. WIND RESOURCE POTENTIAL. 2. 4. 3. 1. FAIR. GOOD. EXCELLENT. OUTSTANDING. MARGINAL.

kyrie
Télécharger la présentation

Small Wind and Solar Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Small Wind and Solar Systems Kristi Robinson Steele-Waseca Cooperative Electric

  2. As of May 10, 2009 5 4 3 2 1

  3. Midwest ISO States with Renewable Mandates

  4. 5 WIND RESOURCE POTENTIAL 2 4 3 1 FAIR GOOD EXCELLENT OUTSTANDING MARGINAL 50 Meter Wind Resource Map DOE - EERE

  5. WIND SYSTEMS Rice Goodhue Waseca Dodge Steele Freeborn

  6. ~$23 per day Average Yearly Production: 44,000 kWh

  7. SOLAR PHOTOVOLTAIC RESOURCE POTENTIAL 4-5 kWh/m2/day 5 -6 kWh/m2/day 6-7 kWh/m2/day

  8. SOLAR SYSTEMS Rice Goodhue Waseca Dodge Steele Freeborn

  9. ~$5 per day Average kWh per Day ~$1 per day Month

  10. Federal Renewable Programs • Residential & Corporate Renewable Tax Credit: • Business and Residential tax credit of 30% of the total install cost of renewable system • (Systems to be less than 100 KW) • Qualifying Systems • Wind turbine Geothermal Heat Pumps • Solar Systems Solar – Water Heaters • Fuel Cells • REAP - USDA Grant/Loan Program: • Agriculture and Small Rural Businesses can apply for 25% of total renewable projects cost • 2010 REAP budget of $70 Million • Energy Efficiency Improvement: • Residential Energy Efficiency Tax Credit – various amount depended on the improvement • REAP – USDA Grant/Loan Program • Qualifying Systems • Water heaters Boilers Furnaces Heat Pumps Building Improvements

  11. State Renewable Programs State Incentive: Wind turbines < 40 KW qualify for net metering. Purchasing utility basically by the power that goes back on the distribution grid at retail rate. SWCE 2010 Buy Back Rates Single Phase Units: $0.1161/kWh Three Phase Units: $0.1107/kWh State Sales Tax Exemption: Wind and Solar systems materials are exempt from sales tax. Includes materials used to manufacture, construct, maintain and repair renewable systems State Property Tax Exemption: Wind and Solar systems are exempt from property tax, (land the system is on is still taxable ). However small production tax does exist if system is greater than 250 KW nameplate. State Solar Rebate: Unknown availability for 2010. Currently a waiting list for Federal Funds.

  12. Costs and Benefits In SWCE Territory – 39 KW Wind Turbine Upfront Cost: (Turbine, Foundation, Labor etc) ~$120,000 Average Yearly Production: 44,000 kWh ~ $ 4,115 per year Insurance and Maintenance ~ $ 750 per year Photovoltaic System ( 2 KW System)* Upfront Cost: (Panels, Inverter, Labor etc) ~$ 18,000 Projected Average Yearly Production: 3,000 kWh ~ $ 315 per year Insurance and Maintenance ~ $ 100 per year *Based on best information available – not SWCE numbers Solar Calculator: Findsolar.com Capacity factor for solar and wind is approximately 15%

  13. Interconnecting a Wind or Solar System to SWCE’s Grid Fill out SWCE Application for Interconnection $250 non-refundable application fee for systems greater than 20 kW Site Visit and Engineering Studies On site meeting with system owner and electrician 3) Contracts Signed 4) Construction and Interconnection SWCE personnel will perform necessary changes to the distribution system and metering for the wind or solar system. 5) Final Collection of Costs Final billing of actual costs accrued by SWCE are billed out less the deposit.

  14. Contracts Three Important Points $300,000 in liability insurance per turbine – SWCE must have proof of insurance Visible, accessible disconnect switch – SWCE has access to wind or solar system Do No Harm Cause • Uniform Statewide Contract for Cogeneration and Small Power Production • Facilities Less than 40 kW • Power Purchase Agreement • Discusses methods of payment, program options, estimated deposit • and retail rate • Minnesota State Interconnection Agreement for Distribution Generation Contract • Encompasses all types and sizes of distributed generation system • Discusses fees, time periods, responsibilities and requirements • Required by the State of Minnesota, created by the MN PUC

  15. SWCE will assist our members with interconnecting to the grid, but… Concentrate on low cost energy efficiency methods first!

  16. Questions? Kristi Robinson 800-526-3514 krobinson@swce.coop