1 / 48

Zain Tanzania Initial Analysis

Zain Tanzania Initial Analysis. Ehsan ElRahman Doaa Abdelatif. SS7 signalling Load. SS7 Load Highlights: High utilization in more than 22% of links Most of the highly utilized links are showing high utilization almost all over the day.

laddie
Télécharger la présentation

Zain Tanzania Initial Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Zain Tanzania Initial Analysis Ehsan ElRahmanDoaa Abdelatif (c) 2008

  2. SS7 signalling Load • SS7 Load Highlights: • High utilization in more than 22% of links • Most of the highly utilized links are showing high utilization almost all over the day. • Mainly the BSC links are highly utilized, HLR link load is normal. • Some Links with BSC are highly overloaded, which may cause call loss. • In and out link load of some SCP links are not properly distributed ( Load sharing issue) • Link Busy hours found in between 20th to 22nd every day. (c) 2008

  3. SS7 signalling Load • Proposed solutions: • Increase Link Capacity between BSCs and MSCs • Proper Load sharing mechanisms • Information required for more investigations: • SS7 network design • Signaling routing Plan (c) 2008

  4. SMS Analysis • Highlights • Low Success rate • Lowest MS to MSC Success rate (72% to 66%) in MSS04 and MSS08 • Lowest MSC to MS delivery success rate in MSS05 (c) 2008

  5. SMS Analysis • Proposed solutions: • Shall be after instigations • Information required for more investigations: • Measurements from SMSC to identify SMS failure causes (c) 2008

  6. TG – Analysis TG with over 75% utilization: • TG With Congestion: • High incoming congestion (30% to 70%): B4BW3TI-B4BW3TO of MSS05 • High outgoing congestion (28% to 75%): B4BW3TI-B4BW3TO of MSS05 Some other TG with above 1% to 30% congestion (c) 2008

  7. Switching Capacity and GoS (c) 2008

  8. Switching Capacity- Subs Sudden decrease on 23 Nov, more investigation is required (c) 2008

  9. Switching Capacity- Subs Sudden decrease on 23 Nov, more investigation is required, more data on following days may be required (c) 2008

  10. Switching Capacity- Subs Sudden decrease on 23 Nov, more investigation is required, more data on following days may be required (c) 2008

  11. Switching Capacity- Subs (c) 2008

  12. Switching Capacity- Subs (c) 2008

  13. Switching Capacity- Subs Sudden decrease on 23 Nov, more investigation is required, more data on following days may be required (c) 2008

  14. Switching Capacity- Subs (c) 2008

  15. Switching Capacity - BHCA (c) 2008

  16. Switching Capacity - BHCA (c) 2008

  17. Switching Capacity - BHCA (c) 2008

  18. Switching Capacity – CP Load (c) 2008

  19. Switching Capacity – CP Load (c) 2008

  20. Switching Capacity Highlights • ALL MSCs has free capacity as CP Load is less than 50% • According to data, the total capacity is less than carried on DSMSS03, DSMSS04, DSMSS05, DSMSS06, DSMSS07, DSMSS08, DSMSS09 . This required more clarification on definition or there is discrepancy • More data required for trend • More information required to evaluate low number of subs on 22/11 & 23/11 (c) 2008

  21. Paging Failure Rate (c) 2008

  22. Paging Failure Rate (c) 2008

  23. Paging Failure Rate (c) 2008

  24. Paging Failure Rate (c) 2008

  25. Paging Failure Rate (c) 2008

  26. Paging Failure Rate • Highlights • Failure rate is too high, max value of failure rate is on average 17-32% ( Average on network is 27%), i.e Paging Success rate on the network as an average is almost 73% • More investigations and Analysis for paging are required • Some MSCs has no data at all (c) 2008

  27. Location Updates Success rate (c) 2008

  28. Location Updates Success rate (c) 2008

  29. Location Updates Success rate (c) 2008

  30. Location Updates Success rate (c) 2008

  31. Location Updates Success rate (c) 2008

  32. Location Updates Success rate • Highlights • LU Success rate is too low, it varies between 83-95% on most of MSCs( Average on network is about 92%), • More investigations and Analysis for paging are required • Some MSCs has no data at all (c) 2008

  33. Handover Success rate( OC) (c) 2008

  34. Handover Success rate (OC) (c) 2008

  35. Handover Success rate (OC) (c) 2008

  36. Handover Success rate (OC) (c) 2008

  37. Handover Success rate (OC) (c) 2008

  38. Handover Success rate( IC) (c) 2008

  39. Handover Success rate (IC) (c) 2008

  40. Handover Success rate (IC) (c) 2008

  41. Handover Success rate (IC) (c) 2008

  42. Handover Success rate (IC) (c) 2008

  43. Handover Success rate • Highlights • HO Success rate is too low, it varies between 76-91% on most of MSCs( Average on network is about 84%), • More investigations and Analysis for HO are required ( handover per cell, handover per BSC, per LAC,..etc) • Some MSCs has no data at all (c) 2008

  44. Missing Data • All data is not collected on same dates /time . This required to collect data for complete 1 week at Busy Hour • No Data From Astelia • No Drive Test or Benchmarking Data • Missing network design and traffic information according to the attached file ( green is missing in existing data and shall be considered when new data is collected (c) 2008

  45. Summary of Initial Analysis • High Utilization on Signaling Links • High Utilization on trunk groups • Low Paging Success Rate • Low LU Success rate • Low HO Success rate (c) 2008

  46. Recommendation • Run a new data collection for 1 week • Meet customer and discuss the following: • Target Value of KPIs ( HO, LU, CSSR, call setup delay,…) • Benchmarking with competitors • Review Initial network plan and design • Analysis of the new data • Recommendation ( Short Term/Long term) (c) 2008

  47. References • ITU Signaling & Traffic related standards To be filled • 3GPP related Quality standards To be filled • Ericsson related design guidelines To be filled • Contracted KPIs values To be filled (c) 2008

  48. Thank You (c) 2008