Assorted VTS News Items. Project subtasks: Aseet Mukherjee is designing a thermometry system for 9-cell cavities R&D stage Currently planning cryo test of cheaper thermometers in ICB (with help from E. Barzi) Andrei Lunin has preliminary RF design for a VTS input coupler

lala
Télécharger la présentation

Assorted VTS News Items

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Assorted VTS News Items • Project subtasks: • Aseet Mukherjee is designing a thermometry system for 9-cell cavities • R&D stage • Currently planning cryo test of cheaper thermometers in ICB (with help from E. Barzi) • Andrei Lunin has preliminary RF design for a VTS input coupler • Will prepare some plots showing operational range in terms of measurement quantities • Valeri Poloubotko will design the radiation shielding lid/movement • Communications with management • VTS project progress report for GDE to be submitted today • Only approved tasks appear • Completed tasks FY06, and plans for remainder FY06 and FY07 • Proposal for two additional VTS’s (>FY07) in preparation (R. Kephart et al.) • VTS update to ILC/SRF R&D meeting Thursday August 3 • Plan for MOU addendum with JLab for Tom Powers’ time on RF commissioning • Plan for electronic logbook (M. Votava) meeting today at 2 pm C.M.Ginsburg VTS Group Mtg

  2. Update of ILC/FNAL RF responsibilities NB: Ralph Pasquinelli is overall responsible person for ILC/FNAL RF Generally: AD is responsible for RF outside the cryostat; TD is responsible for RF inside (cables, input couplers, etc.) C.M.Ginsburg VTS Group Mtg

  3. RF System Design Review • Charge to the committee • Assess and comment on all technical aspects of the IB1 VTS RF system design, and • Provide a written report.  • Committee members: Ralph Pasquinelli (chair), Jim Steimel, Brian Chase, Chuck Worel, John Reid, Wolf-Dietrich Moeller • Time/date/location/deadlines • Thursday, August 24, 8:30-12:30 • IB1 Mezzanine conference room • Background materials to committee by August 17 C.M.Ginsburg VTS Group Mtg

  4. VLCW06 News: Gradient task force Charge to the committee • The RDB is asked to set up a task force to carry out a closely coordinated global execution of the work leading to the achievement of the accelerating gradient specified in the ILC Baseline (BCD) • A definition of the goals for the cavity performance in terms of gradient and yield and a plan for achieving them should be proposed by this group, which should take account of the global resources available and how they may be used most rapidly and efficiently. • The accelerating gradient performance and yield should be specified both for an individual 9-cell cavity and for an individual cryomodule, and the plan should cover the demonstration of this performance in both cases. • The GDE will facilitate the coordination at the global level to achieve this vital goal asap. • Members: Hitoshi Hayano, Toshiyasu Higo, Lutz Lilje, John Mammosser, Hasan Padamsee, Marc Ross, Kenji Saito C.M.Ginsburg VTS Group Mtg

  5. VLCW06 News: Gradient task force • Make tests more reproducible among labs • Define tests needed on 9-cells • complete documentation of prep/test process • develop common set of parameters • results more comparable • Synchronize efforts globally • model of international coordination of R&D efforts • distribute work load C.M.Ginsburg VTS Group Mtg

  6. VLCW06 News: Gradient task force • Stage 1 “Tight-loop” (finish mid-2007) • Start with 20 cavities globally. Carry out the full treatment once • Pick out the best 9 cavities and distribute 3 per location. These 9 cavities have a starting average gradient and spread. • Show reproducibility of “final process” with 3 best cavities at each location by using the tight-loop EP 20um/HPR/test. # cavities x 3 cycles = 9 tests per location • Determine spread and best gradient for final treatment process • Stage 2 “improved tight-loop” (finish mid 2008) • Include improvements from the parallel/coupled R&D program • Repeat the first stage with the same 9 cavities, get smaller spread with higher gradient • Stage 3 “Production Like” (start 06) • Order a large number of cavities starting asap in 06/07 • According to first assessment, total number of cavities in hand by end of 2007 could be ~50-60 • Stage 4 “Final Production” (finish mid-2009) • Carry out full treatment. Apply best recipe from stage 2 to large batch of cavities C.M.Ginsburg VTS Group Mtg

  7. VLCW06 News: Gradient task force (Preliminary) set of common tests for 9-cells • Check for hydrogen contamination of the niobium material (Q-disease) • Stay at 100K for 8 hours during cooldown, cool down curve should be provided • As this test significantly extends the testing time for some labs, may be omitted after confidence has been gained, that the processes do not contaminate the niobium with hydrogen. • Common Q(T) measurement field level: about 1 MV/m for residual resistance measurement • p mode as a standard decision on the data, but all 9 passband modes have to be measured in order to interpret this right • information of the field flatness has to be added (known); some times we see results, hard to understand and not to explain with the bad field flatness • Help to localize the problem -    Checks of fundamental mode spectrum for possible detuning of the field flatness (instead of bead-pull) • Deformation in field flatness would lead to a unusable information from the passband modes measurement (if the field flatness is known, it could be recalculated) • Further information to be provided with the data above include: • Continuous pumping during test or closed cavity vacuum valve • If closed, pressure before closing valve •     Cooldown speed • Temperature difference over cavity during cooldown • Method of low-power processing if necessary • pulsed or cw • Coupler type (fixed or variable) • Recorded quantities: Eacc, Qo, Qext, Qtrans, Qhom, Pfor, Prefl, Ptrans, Phom, Beta, frequency, He bath temperature, X-ray flux, Comments C.M.Ginsburg VTS Group Mtg

  8. RF Design Review Proposed Agenda For discussion • Introduction to VTS (Camille) [15 mins] • Introduction to the team members • Project scope/progress/plans (copy/update talk from July 6 ILC/SRF meeting) • Infrastructure (Cosmore) [15 mins] • Proposed instrumentation rack location, assembly area, etc. • Drawings with shielding location and movement (as known) • Technical parameters of the measurements (Joe) [30 mins] • Test plans, testing capacity (including cryo capacity) • Pages 1-5 of May 12 talk, with emphasis on what is measured, and why. (motivate the design) • Required frequency range, phase and amplitude stability, input power step size • Some data from JLab or DESY of measurement ranges, as available/relevant • RF System Engineering Design (Tom) [45 mins] • Schematics • Data acquisition and control • RF System Implementation plans (Joe/Ruben) [30 mins] • Instrumentation list • Summary/status of purchases • Project tasks/milestones/resources/schedule C.M.Ginsburg VTS Group Mtg

  9. RF Design Background Materials • Test plans, testing capacity C.M.Ginsburg VTS Group Mtg