1 / 25

Every Day Counts

Every Day Counts. A smarter way to do business. Tennessee Operations and Safety Conference November 21, 2013. Pam Heimsness Safety and Traffic Ops Team Leader. What is the Vision/Goal? . EDC 2 Focus Areas. Shortening Project Delivery Reducing Construction Time

lamont
Télécharger la présentation

Every Day Counts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Every Day Counts A smarter way to do business Tennessee Operations and Safety Conference November 21,2013 Pam Heimsness Safety and Traffic Ops Team Leader

  2. What is the Vision/Goal?

  3. EDC 2 Focus Areas • Shortening Project Delivery • Reducing Construction Time • Innovative Contracting • 3D Engineered Models for Construction • Accelerated Bridge Construction • Alternative Technical Concepts • Construction Manager / General Contractor • Design Build • Intelligent Compaction • Locally Administered Federal-Aid Projects • Programmatic Agreements

  4. EDC 2 Focus Areas • Environment • Mobility • Safety • Geospatial Data Collaboration • High Friction Surface Treatments • Implementing Quality Environmental Documentation • Intersection and Interchange Geometrics • SHRP2 Incident Management Responder Training

  5. Status of EDC 2 Initiatives in Tennessee Accelerated Bridge Construction • Prefabricated Bridge Elements & Systems (PBES) • Possible project for accelerated superstructure replacement on 4 structures in I-40 in Davidson County • Cocke Co. SR9/French Broad River is using PBES and is under construction

  6. Status of EDC 2 Initiatives in Tennessee Accelerated Bridge Construction • Slide In Bridge Construction • Project is under consideration for bridge replacement on Norfolk Southern Railroad bridge Rand Poplar Ave – Bridges over I-240 in Memphis. • This is also being considered for CMGC

  7. Status of EDC 2 Initiatives in Tennessee • Construction Manager General Contractor (CMGC) • May 13, 2013 TN enacted legislation for TDOT to implement Contracts for a CMGC Pilot Program made up of three challenging or complex projects • Peer Exchange - Sept 18-19, 2013 with Utah, Arizona, & Colorado • Representatives from the Arizona, Colorado, and Utah State Departments of Transportation presented their experience in developing and implementing this innovative delivery method to an audience of seventy-five individuals representing the Tennessee consulting and construction industry, as well as TDOT staff. • A draft policy and procedures manual is under development.

  8. Status of EDC 2 Initiatives in Tennessee • Intelligent Compaction • Intelligent Compaction Special Provision has been completed • TDOT received $1,445,600 Highways for Life grant for four projects. 4 projects (one in each Region) have been awarded • On Oct 23, 2013 a HFL showcase on intelligent compaction was held in Brentwood, TN.

  9. Status of EDC 2 Initiatives in Tennessee • Locally Administered Federal Aid Projects • A new LPA process had been developed and the Local Government Programs Manual was updated • A webinar will be held Dec 4, 2013 to rollout the new innovative delivery process, letters of interest from the locals will be accepted after Jan 1, 2014. • New process will be optional • Local agency will have complete a certification process in order to be eligible • Process will proceed from environmental through construction with no interaction from TDOT • At the end, TDOT will verify that the local agency followed the new process

  10. Status of EDC 2 Initiatives in Tennessee • Programmatic Agreements II • Completed a regional programmatic agreement practitioner workshop for Alabama, Mississippi, Kentucky, and Tennessee in TN. • Programmatic agreements • Indiana Bat MOU • Nashville Crayfish • PM 2.5 Consultation Process

  11. Status of EDC 2 Initiatives in Tennessee • Geosynthetic Reinforced Soil (GRS)-Integrated Bridge Systems (IBS) • TDOT developed an evaluation process on how to evaluate site conditions for potential locations for GRS-IBS technology. TDOT is searching for the right projects to use with this technology.

  12. Status of EDC 2 Initiatives in Tennessee • High Friction Surface Treatment • High Friction Surface Treatment Program Developed to address a systemic approach of implementing lane-departure countermeasures to identified horizontal curves. • TDOT to apply HFST on 427 locations total. Recently let a project to address 100 locations FIGURE 1: Open-grade surface course on the left and HFST on the right. FIGURE 2: HFST at horizontal curve

  13. Status of EDC 2 Initiatives in Tennessee • Implementing Quality Environmental Documentation • FHWA and TDOT completed revision to Categorical Exclusion documentation templates. • TDOT completed a process review of their PCE Documentation Process and as a result they are updating their standard interagency letter templates to improve consistency and quality of coordination. • TDOT has also been developing an integrated electronic clearinghouse (called the Statewide Environmental Management System or SEMS) to post, store, and manage project environmental data and interagency coordination. • TDOT revised their internal QA/QC procedures to ensure three separate lines of quality assurance in documentation preparation.

  14. Status of EDC 2 Initiatives in Tennessee • SHRP2 National Traffic Incident Management Responder Training • Estimate of 141 TIM trainers certified in 5 TtT sessions.  Estimate of 642 responders trained in 26 sessions. • TDOT is also working with TDOS to build a TIM Training Site at the THP Academy construction to begin in spring 2014.

  15. Original EDC 1 Focus Areas • Shortening Project Delivery

  16. Original EDC 1 Focus Areas • Accelerating Technology Deployment

  17. State Transportation Innovation Councils (STICs) • Provides State-based leadership for the National Transportation Innovation Network • Helps facilitate deployment of EDC Initiatives • Engages stakeholders

  18. STIC Incentive • Purpose: • To provide resources to assist the STIC in making an innovation standard practice in their state • Funding: • Up to $100,000 per State/year • Federal share of 80% • Entities Eligible to Apply for Funding: • STA will be the primary recipients. • Metropolitan planning organizations, local governments, and tribal governments may apply through States as sub-recipients.

  19. STIC Incentive • Examples of Allowable Costs, but are not limited to: • Develop standards and specifications. • Develop and deliver training and an evaluation plans • Refine current specifications • Develop memorandums of agreement • Prepare standard operating procedures or technical guidance • Prepare a report summarizing the lessons learned and economic analysis • Develop a decision matrix • Prepare an integration plan, including performance measures

  20. EDC2 – Exchanges Wednesday, December 4, 2013 (Nashville and Knoxville) Intersection and Interchange Geometrics: Safer, Faster, Cheaper! (FHWA) is promoting several proven techniques to improve the safety of intersections: roundabouts, displaced left-turn intersections, restricted crossing U-turn intersections, median U-turn intersections, and the diverging diamond interchange. Transportation agencies that apply these innovative intersections and interchanges can not only reduce crashes, but greatly enhance efficiency for moving traffic, often with substantial cost savings and accelerated project delivery. register at the TTAP’s website - http://ctr.utk.edu/ttap/training/edcx7.php

  21. Keeping the Momentum “My overall sense is that we’ve been very successful in bringing a greater focus on innovation to the transportation community… Now our challenge is to keep the momentum going and make our better, faster, smarter approach a permanent part of the transportation culture.” Victor Mendez Administrator, FHWA

  22. Winner!

  23. For More Information Center for Accelerating Innovationhttp://www.fhwa.dot.gov/accelerating/ Every Day Counts Websitehttp://www.fhwa.dot.gov/everydaycounts Tennessee EDC CoordinatorsFHWA: Pamela Heimsness, pamela.heimsness@dot.gov TDOT: Jeff Jones: Jeff Jones, jeff.jones@dot.gov

  24. Thank you!

More Related