1 / 10

Pine Bluff Arsenal Associated Project Work Standard Study

Pine Bluff Arsenal Associated Project Work Standard Study. Principal Investigator: Dr. Steven L. Johnson Assistants: Karen Kelly, Jennifer Farris, Gim Goh, Sudeep Acharya, Oon Wei-Chek. Project Overview. Objectives Measure current times for production operations.

lance
Télécharger la présentation

Pine Bluff Arsenal Associated Project Work Standard Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pine Bluff ArsenalAssociated ProjectWork Standard Study Principal Investigator: Dr. Steven L. Johnson Assistants: Karen Kelly, Jennifer Farris, Gim Goh, Sudeep Acharya, Oon Wei-Chek

  2. Project Overview • Objectives • Measure current times for production operations. • Perform ergonomic and methods analysis for operations within production lines. • Set new time standards for all production lines. • Use simulation to analyze production line operations and suggest improvements.

  3. Process Documentation and Methods Analysis • Documentation of current production line operations station by station. • Element Description • Raw Data Time Sheets • Summary of Time Sheets • Crew Size for Each Production Line

  4. Example: Element Description

  5. Example: Raw Data Time Sheets**Actual data values have been changed. Times are in 1/100 minutes.

  6. Example: Summary of Time Sheets

  7. Example: Crew Size

  8. M929 Load, Assembly, and Pack (LAP) M929 WP Fill M722 LAP M722 WP Fill M767 LAP M767 Body Load M819 LAP M819 RP Mix, Fill, and Press M825 Rework M1006 Projectile Glatt Smoke Mix M18 Grenade M83 Grenade Grenade Packout M291 Decontamination Kit Production Lines Analyzed

  9. Arena Analysis Simulation Modeling of M929 LAP Line Using Arena 3.01

  10. Conclusions • Recommended work standards for current operations on production lines studied. • Recommended methods and job content improvements through ergonomic and methods analysis. • Used simulation to suggest new line set-up for M929 production line.

More Related