1 / 11

Mu2e Conventional Construction Conventional Mechanical Informational Phase

Mu2e Conventional Construction Conventional Mechanical Informational Phase. Value Engineering Review of Mu2e 2/14/2013 Emil Huedem. Mu2e Conventional Scope. Conventional Facilities System / Building Utilities Chilled water piping & meter (from CUB) Natural gas piping & meter

leena
Télécharger la présentation

Mu2e Conventional Construction Conventional Mechanical Informational Phase

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mu2e Conventional ConstructionConventional MechanicalInformational Phase Value Engineering Review of Mu2e 2/14/2013 Emil Huedem

  2. Mu2e Conventional Scope • Conventional Facilities System / Building Utilities • Chilled water piping & meter (from CUB) • Natural gas piping & meter • Plumbing/Drainage/Fire Protection • HVAC • ICW (Industrial Cooling Water / Casey’s Pond) • Part of ODH (Oxygen Deficiency Hazard) • OTHER Process cooling system (not part of Conventional) • LCW, RAW, Tracker cooling etc E. Huedem - VE Review

  3. REQUIREMENTS / CRITERIA (surface bldg) • HIGH BAY • About 35KW LOAD TO AIR (about 50% of space peak cooling load) • RAW skid = very small CHW • NO ODH • 68F min / 78F max • Positive wrt lower space (when blocks are in place) • No tight temperature stability reqmnt • SOLENOID PS ROOM • About 43KW LOAD TO AIR (about 80% of space peak cooling load) • 6,300 CFM ODH • 68F min / 85F max • Positive wrt lower space • No tight temperature stability reqmnt • DATA ROOM • About 50KW LOAD TO AIR (about 95% of space peak cooling load) • NO ODH • 68F min / 85F max • >21% min RH • MECH/ELEC ROOM • Tracker System 7gpm CHW • NO ODH • 68F min E. Huedem - VE Review

  4. CURRENT DESIGN CONCEPT (surface bldg) • HIGH BAY • Indoor Air handler with • Chilled water coils • Nat gas duct furnace • Economizer • Single zone VAV • Resets (explore in design) • SOLENOID PS ROOM • Indoor Air handler • Chilled water coils • Nat gas duct furnace • Economizer • Single zone VAV • Resets • ODH wall exhaust & Louvers • MECH/ELEC ROOM • Gas unit heater & Ventilation Louver (roof or wall) • Place for HVAC serving lower space • Place for ODH intake fan for lower space • CHW, DWS & ICW piping entrance • Will house • Tracker cooling HX/pump • Glycol chw pump/hx/ tank • ICW strainer..etc • DATA ROOM • Chilled water CRAC with humidifier • Non-raised floor E. Huedem - VE Review

  5. REQUIREMENTS/ CRITERIA (below surface bldg) • LOWER • About 21KW total LOAD TO AIR • ICW to vaccum pump • Small CHW usage (?) • 7,000 CFM ODH • 68F min / 80F max • No minimum humidity • No tight temperature stability reqmnt • Magnetic field / limited space? E. Huedem - VE Review

  6. CURRENT DESIGN CONCEPT (below surface bldg) • LOWER • ODH exhaust fan & intake air unit (surface located and ducted down) • HVAC (surface located and ducted down) with chilled water coil/ nat gas heating unit/ Economizer (locations explore during design) • Sump • ICW line to watercooled equipment • CHW to one minor usage 7000 cfm ODH E. Huedem - VE Review

  7. TARGET AREA • REQMNT/CRITERIA • Decay Time: Airflow to meet transit time set (<60 mins) = equate to max 900cfm if discharging air near wye/pbar • Heat load to air @ Target area =small = ~6 KWmax (might just go to wall) • <50F dewpoint(OR <50%RH @ ~70F or<35%RH @ 85F) currently ok! • No reqmnt in remote handling & extinction monitor space • Space to be Negative compared to adjacent space (?”w.c.) • 7,000 cfmODH • Magnetic field • ~900 cfm 7000 cfm ODH Beam tunnel Remote handling ODH MUA • CURRENT DESIGN CONCEPT • Current scheme to provide DX (refrigerant based) system to provide 45F dp supply air, • preliminary selection with modulating hot gas bypass reheat • Natural gas heat • Exhaust fan at near pbar • ODH make up air unit in the surface ducted & separate exhaust fan • Need good air seal between DS & PS • Once through system- no recirculation of air • No air cooling in the beam tunnel DX AHU ?? Shielding Blocks?? E. Huedem - VE Review

  8. Misc Items • Final Load Criteria in Process • Ventilation in former PBAR area • More racks/power supplies in the high bay? • laser room in lower area? • Mu2e is committed to meeting the DOE Guiding Principle, where applicable • Some item -Value engineering • Bldg energy model- can use as tool during design • Commissioning E. Huedem - VE Review

  9. MISCELLANEOUS TABLES FOR REFERENCE E. Huedem - VE Review

  10. Mu2e ConvMech Load table (as of Feb 13 2013)excluding tunnel area, MC1 and former PBAR bldgs E. Huedem - VE Review

  11. Mu2e Guiding Principle Summary E. Huedem - VE Review

More Related