Field emission Add R28 spring Hi-Pot 130keV

Gun2: hi-potting to 150kV, transition to 130keV operations, Glassman 150kV HVPS failure. Restore at 100kV. 9/17 Vwien 9/21 Hwien. Run the program Need to check performance. Ops setup @130kV. New oil t ank R28. Glassman 150kV HVPS fails End of beam 2010. Hi-pot 150kV

lena
Télécharger la présentation

Field emission Add R28 spring Hi-Pot 130keV

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gun2: hi-potting to 150kV, transition to 130keV operations, Glassman 150kV HVPS failure Restore at 100kV 9/17 Vwien 9/21 Hwien Run the program Need to check performance Ops setup @130kV New oil tank R28 Glassman 150kV HVPS fails End of beam 2010 Hi-pot 150kV Vac burp @150kV 1 hour soak Recover @100kV Field emission Add R28 spring Hi-Pot 130keV First ramp 150kV Vac burp @ 150kV Data 90-150kV Noisy anode @140kV New 150kV HVPS Restore 130kV and go… 130keV demo Beam to ILD 10/12 Vac burp QE loss X-ray detector

More Related