T.A. on Characterization of supraconductors and magnets

T.A. on Characterization of supraconductors and magnets. Motivation SC strands and Cable Test Facility Magnet Test Stations Potential Partners. Motivation for SC Magnet & Conductor Tests. Development of new conductors (NbSn, NbTi. others) for High Field Magnets

lev-weber
Télécharger la présentation

T.A. on Characterization of supraconductors and magnets

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T.A. on Characterization of supraconductors and magnets • Motivation • SC strands and Cable Test Facility • Magnet Test Stations • Potential Partners

  2. Motivation for SC Magnet & Conductor Tests • Development of new conductors (NbSn, NbTi. others) for High Field Magnets • Validation of conductors (strands, cables, solid conductor) for magnet manufacturing : Ic measurement, magnetization, Rc (interstrand resistance) of cables • Development of magnets : studies on training and stability, thermal and mechanical behaviour, protection, field quality • Quality Control of magnets before installation Projects Involved : • NbTi magnets for LHC Low Beta Upgrade • JRA High Field Magnets • (ITER, GSI)

  3. SC Strand & Cable Test Facility • 1 cold box 130 LHe l/h, 6000 l dewar • FRESCA facility for Ic cable test : up to 17 mm section, in 10 T field, current up to 32 kA, Temperature from 1.8 K to 4.4 K Infrastructure  1 M€, 1 test  20 k€ Expected : 10 test /year for NbTi Luminosity Upgrade (1/5 of equipment capacity) • 7 small cryostats for strand samples tests (Infrastructure  1 M€): • 2 cryostats for Ic on NbTi strand : 1 kA, B = 11 T at 4.2 K, 13 T at 1.9 K • 1 cryostat for Ic test on Nb3Sn strand : 4 kA, B = 12.5 T at 4.2 K • 1 cryostat for thermal transfer measurements on insulated cable : • 1 cryostat for Rc test on cable samples : 4.2 K • 1 cryostat for RRR test on NbTi and Nb3Sn strands • 1 cryostat for Magnetisation test on NbTi strands(to upgrade to Nb3Sn) Expected : 100 test /year for NbSn dev. (1/10 of equipment capacity)

  4. SC Strand & Cable Test Facility

  5. Magnet Test Plants • 12 benches for SC Cold masses up to 15 m long, 15 kA, 1.9 K & 4.3 K Infrastructure  30 M€, 1 test 20 k€ Expected for 2009-2012 : LHC exploitation and low beta upgrade (max. 6 benches) • Test Station with 4 Vertical Cryostats, 20 kA max, 1.9 K & 4.3 K Infrastructure  5 M€, 1 test  5 to 10 k€ Expected for low  upgrade and NbSN dev : 1/2 of equipment capacity (plan to merge it with SM18 Test Plant) • Several external partners make use of Magnetic Measurement Equipment for cryogenic and room temperature measurement (including R.T. magnets) available at CERN.

  6. SM18 Magnet Test Plant

  7. Potential Partners • INFN : Test of prototype Fast Cycling NbTi magnets • ITER : Test of strands • CEA : Test of model NbSn magnets • GSI : Test of strands, cables, prototype magnets (in vertical cryostats) and prototype cold masses (on SM18 test Benches) N.B. : preliminary discussions to test > 300 series cold masses • USA labs for LARP and other NbSn prototype NbSn magnets • University of Sannio (It) : collaboration to develop acquisition systems Proposal : 250 k€ for partners support to the tests, including transport and modification of equipment