1 / 1

Physik an Hadronen- Beschleunigern

FSM. Front-end electronics. The ATLAS MDT Control System. SUSY-Suchen mit b-Jets. Graduiertenkolleg. G. Bobbink, H. Boterenbrood, R. Hart , NIKHEF, Amsterdam, Netherlands S. Zimmermann, Physics Institute, Freiburg University, Germany. Stefan Winkelmann (Abteilung Jakobs).

lewis
Télécharger la présentation

Physik an Hadronen- Beschleunigern

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FSM Front-end electronics The ATLAS MDT Control System SUSY-Suchen mit b-Jets Graduiertenkolleg G. Bobbink, H. Boterenbrood, R. Hart, NIKHEF, Amsterdam, Netherlands S. Zimmermann, Physics Institute, Freiburg University, Germany Stefan Winkelmann (Abteilung Jakobs) Physik an Hadronen- Beschleunigern ICALEPCS 2009, Kobe, Japan Magnetic-Field MDT Sub-Detector • B-sensors: 1773 • Precision 10-4 • Max. field 1.4 [Tesla] • Calibrated • Unique ID • stability < 0.5 Gauss • Hall-sensor(x,y,z) + T • Monitored Drift Tubes • 1200Chambers (various shapes/sizes) • Barrel & Endcap: 3 layers (Inner, Middle, Outer) • number of tubes: ± 400,000 BOL–chamber under construction MDT-chamber: Read-out (RO) side Mezzanines: physics readout CSM (Chamber Service Module) JTAG expert panel CSM-ADC DCS – CAN-bus based CSM • Max. 18 Mezzanines/chamber • Monitoring: V & T • MDT: 14,236 Mezzanines • MDM (MDT-DCS-Module) • Based on ELMB • CAN field-bus • 64 channel 16bit ADC • 24 digital I/O • Sub-systems covered: • T: Temperature • B: Magnetic-field • FE: Front-end electronics: • CSM-ADC (V,T) • JTAG PVSS Datapoint structure Not covered: LV, HV, gas, alignment • PVSS-Project / PC • 12 CAN-buses • ± 150 MDT chambers • ± 100,000 datapoint elements • ± 4,000 _address configs OPC Hardware Configuration MDT-Chamber JTAG Magnetic-field CSM-ADC Temperature Node • 8 PCs + 1 super-visor + 1 spare • 96 CANbuses (90 in use) • 6 power crates * 16 PSUs General State/Status display & Browser USA15 Temperature T-sensors: 12,236 Example: JTAG endcap side-A Temperature Overview • FSM-concepts: • Setup/Maintain MDT ready for physics • Tree structure: commands ↓ , states ↑ • Abstract model: summary information Daily report References [1] ELMB Documentation; https://twiki.cern.ch/twiki/bin/view/Atlas/DcsElmb [2] H.Boterenbrood, “MDT-DCS CANopen Module”; http:/www.nikhef.nl/pub/departments/ct/po/html/MDT/MDT-DCS-CANnode.pdf

More Related