An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BARRACKPORE MUNICIPALITY

  2. VISION • “To usher in a new era of urban planning in Barrackpore with citizens participation in a way as to ensure a clean and green environment, freedom from illiteracy and disease, where robust livelihood is possible and where dreams and aspirations are achievable.”

  3. CONTEXT • Barracpore has a history of development – started out as a village • First British Cantonment established here in 1772 • Municipality established in 1916 • Almost linear settlement pattern – first growth along River Hooghly with limited expansion to the east • Subsequently, new development is concentrated on the east of railway line • Cantonment to the north west forms a natural boundary • Today – there is practically no land for expansion

  4. DEMOGRAPHY • Growth of population • 24 Wards – highest population concentration in Wards 4,5,7 (oldest refugee settlements) and lowest concentrations in 16 (swampy lands) and 19 (old estates) • 106 slums with maximum concentration in Ward 16, 17, 18, 20

  5. INITIATING THE DDP • Meeting among all Councilors • This is an opportunity for capacity building therefore – all staff would be involved in the process • DPG and DTG (3) formed – functional delineation of responsibility but, close coordination in decision making – communication was key • Building on lessons learnt under CSIP 1c – participatory planning • CDS, TCGs, Health Workers, RCVs – extensively involved in community consultations – provided an insight into the houses of residents

  6. THE PROCESS • Formal interactions • Many informal interactions

  7. THE STAKEHOLDERS • Citizens of Barrackpore • Staff across ALL departments of municipality • CDS Groups, TCGs, RCVs, Health Workers • Slum dwellers • Local Trade Associations • Informal Sector Workers • Pre Primary and Primary School staff • NGOs

  8. SURVEYS • Primary data collection • Technical survey for Component 1 • Socio economic survey • QSS • Social Mapping • Economic Survey for LED • Citizens Satisfaction Survey • School children drop out rate survey • All relevant secondary data • In analysis – detailed GIS mapping done

  9. OBSTACLES • Barrackpore is an old town that has grown unplanned • Force planning onto this spread • Land is a huge constraint • Attracting people from surrounding areas – population pressure

  10. FOCUS OF THIS DDP • Livelihoods • Women’s empowerment • Education especially of girls in minority communities • Public Health Delivery System • Institutional strengthening WHY THIS FOCUS…… • Land availability will necessarily constrain interventions • Infrastructure related interventions at municipality level will continue BUT move from ‘reactive’ maintenance to ‘preventive’ maintenance • Trans municipal infrastructure is critical for sustainability

  11. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development • 1.1 Slum Infrastructure Improvement Plan • Access to basic services • Integration of slum infrastructure • Community participation in programme implementation and monitoring

  12. IDENTIFIED PROJECTS1.1 Slum Infrastructure Improvement Plan • 106 slums of which 9 already supported under KUSP • Remaining 97 slums to be taken up on basis of QSS • From KUSP funds an additional 26 slums will be funded • 9+26 = 35 already funded • 71 slums will be funded from other sources • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 12,39,61,180 (Rs. 12 crores)

  13. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development 1.2 Intra Municipal Infrastructure Improvement Plan • At least 135 lpcd water supply • Drainage • Maintaining drainage outfalls • Access to sanitary latrines • Solid waste management including hospital waste management • Improving road network

  14. IDENTIFIED PROJECTS1.2 Intra Municipal Infrastructure Improvement Plan • Modernisation of solid waste collection system • Maintenance of existing infrastructure and services • Construction of new drains • Improvement of roads • Extension of water supply network • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 12,88,89,000 (approx. Rs. 13 crores)

  15. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development 1.3 Trans Municipal Infrastructure Improvement Plan • Changing to a surface water supply source • Storm water drainage • Increasing connectivity • Treatment and disposal of sewerage

  16. IDENTIFIED PROJECTS1.3 Trans Municipal Infrastructure Improvement Plan • Widening of BT Road, Barrackpore-Kalyani Expressway, Barasat Road, Old Calcutta Road • Construction of a new road connecting Old Calcutta Road and Barrackpore-Dum Dum Expressway • Road over bridge of railway track at Gate 15 • Maintenance and improvement of all outfalls carrying storm water • Positioning Barrackpore on the tourist map of West Bengal

  17. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development 1.4 Land use Development Plan • Making land available for various uses • Decongestion • Enforcement of regulation • Resettlement and rehabilitation of squatter settlements

  18. IDENTIFIED PROJECTS1.4 Land use Development Plan • Construction of market complexes and municipal markets • Construction of under ground reservoir to supply water from surface source • Building of new ward offices • Construction of at least one children’s park per ward and up gradation of existing sports grounds and parks • Construction of housing for the poor and economically weaker sections residing in slums • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 21,73,00,000 (approx. Rs. 22 crores)

  19. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development 1.5 Environment Management Plan • Creating awareness • Periodic testing of water • Conservation of water bodies and wetlands • Regulation of industrial pollution • River side development

  20. IDENTIFIED PROJECTS1.5 Environment Management Plan • Disaster Preparedness • Community Awareness • Rain Water Harvesting and conservation of water • Cattle shed removal / waste management • Environment quality monitoring and surveillance • Setting up of Trans-municipal laboratory for water / air / noise / soil testing • Heritage conservation • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 1,55,15,000 (Rs. 1.5 crores)

  21. DEVELOPMENT GOALSComponent 2: Social and Livelihoods Development 2.1 Livelihood and Poverty Alleviation • Implementation of government plans and schemes • Strengthening of UPE Cell

  22. IDENTIFIED PROJECTS2.1 Livelihood and Poverty Alleviation • Vocational training in various trades • Capacity building of UPE Cell • Creation of a poverty data bank • Establishing a ‘loan recovery cell’ • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 87,05,000 (Rs. 87 lakhs)

  23. DEVELOPMENT GOALSComponent 2: Social and Livelihoods Development 2.2 Local Economic Development • Utilisation of local resources • Creating infrastructure for local industry • Identifying marketing opportunities

  24. IDENTIFIED PROJECTS2.2 Local Economic Development • Entrepreneurship training and marketing assistance to small traders • Creating a cycle rickshaw bank and providing licenses to rickshaw pullers • Motivating urban unemployed through training in entrepreneurship • Promotion of pisciculture • Showcasing local arts and crafts – sankha industry • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 1,17,00,000 (approx. Rs. 1.2 crores)

  25. DEVELOPMENT GOALSComponent 2: Social and Livelihoods Development 2.3 Health Care Service Delivery Improvement Plan • Providing public health services • Reproductive and Child Health Services • Other preventive health care programmes

  26. IDENTIFIED PROJECTS2.3 Health Care Service Delivery Improvement Plan • Creation of data base • Health care infrastructure enhancement • Creating awareness • Organising health camps • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 2,53,80,000 (approx. Rs. 2.5 crores)

  27. DEVELOPMENT GOALSComponent 2: Social and Livelihoods Development 2.4 Primary Education Improvement Plan • Universal education • Literacy programmes • Adequate education infrastructure

  28. IDENTIFIED PROJECTS2.4 Primary Education Improvement Plan • Identification of school drop outs and bringing them back to school • Building new schools • Strengthening mid day meal programme • Adult education programme • Providing education to BPL children • Compulsory education program for the children in 5 to 8 age group covering all wards • Providing certain basic services like drinking water and sanitation facilities • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 1,01,99,000 (Rs. 1 crore)

  29. DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.1 Organisation Development Plan • Improving governance • Manpower planning • Skill development • Capacity Building

  30. IDENTIFIED PROJECTS3.1 Organisation Development Plan • Strengthening Ward Committees • Centralisation of records • Signage in municipal office • Capacity building of councilors and staff • Computerisation (LAN, updating double entry accounting and website) • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 1,16,350 (approx. Rs. 1.2 crores)

  31. DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.2 Internal Processes and Systems Improvement Plan • Simplification of internal processes and systems • Increasing computerisation

  32. IDENTIFIED PROJECTS3.2 Internal Processes and Systems Improvement Plan • Computerisation including software development • Instituting an annual citizens satisfaction survey • Information sharing • Single window operating system • Inter-departmental coordination • Intra municipal performance appraisal system • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs.25,390 (approx. Rs. 25 lakhs)

  33. DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.3 Citizens Interface Plan • Strengthening ward committees • Partnering citizens • Grievance redress • Transparency and accountability in functioning

  34. IDENTIFIED PROJECTS3.3 Citizens Interface Plan • Sharing information • Strengthening BWMC • Grievance redress • Workshops for improving government – citizen working • Setting up information kiosks in ward offices • Up date Citizens charter • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 55,500 (approx. Rs. 55 lakhs)

  35. DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.4 Financial Plan • Enhancing property tax • Improving collection efficiency • Enhancing non tax revenue • Levy of user charges • Outsourcing and redeployment • Financial control and budgeting

  36. IDENTIFIED PROJECTS3.4 Financial Plan • Various interventions for improvements in • Assessment and tax • Water charges • Advertisement tax • Identification of new sources of revenue • License fees • Expenditure management • Asset management • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 13,070 (approx. Rs. 13 lakhs)

  37. TOTAL FINANCIAL ALLOCATION • Component 1 = Rs. 48,56,65,180 • Component 2 = Rs. 5,59,84,000 • Component 3 = Rs. 2,10,31,000 • TOTAL = Rs. 56,26,80,180

  38. PUBLIC VALIDATION • 400 participants at the meeting • High degree of interaction • Written feedback on DDP document • Comments received were largely incorporated either later or had already been included • Those comments not included were for reasons beyond the control of the municipality

  39. CONCLUSION • Implementation of DDP will enable holistic development of Barrackpore • To undo the developmental oversights of the past • To prepare Barrackpore to take its just place in the industrial development map of West Bengal

  40. THANK YOU