1 / 14

California water fix Part 2 Rebuttal

Dr. Jeffrey Michael presents a rebuttal outlining the inconsistencies and unsupported claims related to the economic public interest in the California Water Fix Project. The rebuttal challenges the project's description, operating criteria, and financial analysis, highlighting the lack of expert panels and feasibility/benefit-cost assessments. It also discusses the impacts of the evolving financial plan on water supply allocation and public interest.

liller
Télécharger la présentation

California water fix Part 2 Rebuttal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SDWA-322 California water fixPart 2 Rebuttal REBUTTAL TESTIMONY OF DR. JEFFREY MICHAEL

  2. REBUTTAL OUTLINE SDWA-322 • Gwen Buchholz (DWR 1010) • EIR/EIS does not support claims about economic public interest. • Project Description Is Inconsistent with WaterFix Economic/Financial Analysis and Evolving Financial Plan • Benefits to Agriculture Inaccurate As Financial Plan Changes • Dr. Michael Shires (WWD 18) • Exaggerates Contribution of WWD. • Mostly Irrelevant to Petition. (although one can indirectly infer WaterFix harms WWD)

  3. Economic Public Interest Comments Are Not Supported SDWA-322 Buchholz: “Overall, implementation of CWF H3+ will improve water supply, ecosystem conditions, and economics of the state of California.” • Expert panels for water supply and environmental interests. • Economics • No Expert Panel. • No Feasibility or Benefit-Cost Assessment. • Only cited EIR-EIS for support.

  4. The EIR/EIS Does Not Support Any Conclusions About Economic Public Interest SDWA-322 • From EIR/S Socioeconomic Chapter (emphasis added) “DWR’s Economic Analysis Guidebook provides guidance regarding the economic assessments that should be conducted from project formulation through implementation. These include cost effectiveness, benefit-cost, socioeconomic impacts, risk and uncertainty, and financial analyses. This chapter of the EIR/EIS reports the estimated socioeconomic impacts…The other economic analyses outlined in the DWR guidebook were not conducted as part of the NEPA/CEQA compliance documentation.” • EIR/S Response To Comments “The issue related to the cost estimate or financial viability as raised by the commenter addresses the merits of the project and does not raise any issues with the environmental analysis provided in the EIR/S.”

  5. Project Description Inconsistency SDWA-322 Project Includes: • Facilities • Environmental Commitments • Operating Criteria • In particular, the project includes new operating restrictions on existing south Delta pumps. Petition Operating Criteria Lacks Credibility • Not Supported By Financial Feasibility Analysis • Funding agency analysis assumes WaterFix does not require new restrictions on the existing south Delta pumps.

  6. EIR/EIS Is Clear That Operating Criteria For South Delta Only Apply To WaterFix SDWA-322 • "these proposed operational criteria would only take effect after the proposed conveyance facilities are operational “ (Final EIR/EIS, page 3-263) • “These newly proposed OMR criteria (and associated head of Old River gate operations) are in response to expected changes under the PA, and only applicable after the proposed north Delta diversion becomes operational. Until the north Delta diversion becomes operational, only the OMR criteria under the current BiOps apply to CVP/SWP operations.”  • Biological Opinion Includes Similar Statements

  7. MWD and DWR Economic Analysis Assume Identical South Delta Operating Criteria SDWA-322 • MWD White Paper says operating criteria just an assumption for the EIR. Actual operations will be determined by adaptive management, so use same operating criteria with and without the project. • Compare WaterFix to “Existing Conveyance With WaterFix Operating Criteria” • MWD staff to Board (March 27, 2018 meeting) “no one knows whether regulations will become tighter in the future, but if they do, these things kind of move together…so that’s the 1.3 million acre feet of incremental water supply improvement that we’ve talked about for a long time here and we still think that’s a pretty good estimate of the difference between with and without the project.”

  8. Change to Project Description Increases Water Yield from 0.2maf to 1.3maf SDWA-322

  9. SDWA-322 MWD Staff Says Their Project Description Applies To Future Water Allocation • MWD says 12% change to cost share increases SWP water supply by 156,000 acre feet.

  10. Master Agreement For Unsubscribed Capacity (33%):Major Change to Project Description SDWA-322 • Increases MWD to at least 65% share. • MWD staff on 33% capacity: “that’s ours to manage and make decisions on.”

  11. MWD Staff Comments on expected Master Agreement. SDWA-322 • Agreement Still Being Developed. • Hope that CVP will lease back the 33% capacity (seems very unlikely). • Water supply benefits of 33% capacity are calculated using their project description. • Negative impact on exchange contractor and wildlife refuge water supply in some years. • Estimate an additional 150,000 af of avg. water supply for SWP if CVP does not lease 33% capacity.

  12. New WaterFix Financial Plan Has Major Impacts on Water Supply Allocation and Public Interest SDWA-322 Annual Acre Feet of Delta Exports. (table derived from MWD staff presentation and board materials) Under unsubscribed capacity “Master Agreement,” WaterFix shifts about 450,000 af of water from agricultural to urban users.

  13. Summary and Conclusions SDWA-322 • Lack of financial feasibility and economic benefit-cost analysis reduces credibility of Ms. Buchholz testimony. • No support for economic public interest claims. • Negative water supply and economic effects on agriculture are likely. • Project description is not credible. • Major current changes required by financial necessity. • Will more changes be required in the future? • Dr. Shires testimony is mostly irrelevant.

  14. Board Could Take Actions To Ensure Consistent Analyses and Protect Public Interest SDWA-322 • Petitioners should provide “Master Agreement.” (and supplemental EIR/EIS) • Financial feasibility analysis of proposed project to safeguard against additional financially driven project changes. • Require full public interest analysis, especially environmental, of using a no-project baseline consistent with Petitioners’ economic analysis and financial planning, the “Existing Conveyance With WaterFix Operating Criteria.”