1 / 153

Introduction to Systems Development and Systems Analysis

This chapter covers the phases of the systems development life cycle, the individuals involved, planning techniques, feasibility determination, and managing system changes.

lisawoods
Télécharger la présentation

Introduction to Systems Development and Systems Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HAPTER 18 Introduction to Systems Development and Systems Analysis

  2. INTRODUCTION • Questions to be addressed in this chapter include: • What are the phases in the systems development life cycle? • Who are the individuals involved in systems development? • What techniques are used to plan the development of a system? • How do you determine whether a particular system is feasible? • How do people respond to systems changes, and how can dysfunctional behavior be minimized?

  3. INTRODUCTION • As the environment, technology, and competition change, an information system must continually undergo changes. • These changes range from minor adjustments to major overhauls. • Occasionally, the old system is scrapped and replaced.

  4. INTRODUCTION • Companies change their systems for a variety of reasons: • To respond to changes in user needs or business needs. • To take advantage of or respond to technology changes. • To accommodate improvements in their business process. • To gain a competitive advantage and/or lower costs. • To increase productivity. • To accommodate growth. • To accommodate downsizing or distribute decision making • To integrate incompatible systems. • To replace a system that is aged and unstable.

  5. INTRODUCTION • Developing quality, error-free software is difficult, expensive, and time-consuming. • Projects tend to deliver less than expected and consume more time and money. • A KPMG survey found that 35% of all major information systems projects were classified as runaways—hopelessly incomplete and over budget. • Major cause of runaways: Skimping on systems development processes. • Omitting basic systems development steps becomes tempting but may lead to disaster as developers create well-structured systems that fail to meet user needs or solve business problems.

  6. INTRODUCTION • This chapter discusses five topics: • Systems development life cycle • Planning activities during the systems development life cycle • Feasibility analysis • Behavioral aspects of change • Systems analysis

  7. SYSTEMS DEVELOPMENT LIFE CYCLE • Whether systems changes are major or minor, most companies go through a systems development life cycle. • In this section, we discuss the steps in the cycle and the people involved.

  8. SYSTEMS DEVELOPMENT LIFE CYCLE • The five stages in the systems development life cycle are: • Systems analysis • Conceptual design • Physical design • Implementation and conversion • Operation and maintenance

  9. SYSTEMS DEVELOPMENT LIFE CYCLE • The five stages in the systems development life cycle are: • Systems analysis • Conceptual design • Physical design • Implementation and conversion • Operation and maintenance

  10. SYSTEMS DEVELOPMENT LIFE CYCLE • As organizations grow and change, they may need more or better information. • Systems analysis is the first step. It includes: • Initial investigation • Involves gathering the information needed to buy or develop a new system and determining whether it is a priority.

  11. SYSTEMS DEVELOPMENT LIFE CYCLE • As organizations grow and change, they may need more or better information. • Systems analysis is the first step. It includes: • Initial investigation • Systems survey • If the system is a priority, survey the existing system to define the nature and scope of the project and identify the strengths and weaknesses of the system.

  12. SYSTEMS DEVELOPMENT LIFE CYCLE • As organizations grow and change, they may need more or better information. • Systems analysis is the first step. It includes: • Initial investigation • Systems survey • Feasibility study • Involves an in-depth study of the proposed system to determine whether it’s feasible.

  13. SYSTEMS DEVELOPMENT LIFE CYCLE • As organizations grow and change, they may need more or better information. • Systems analysis is the first step. It includes: • Initial investigation • Systems survey • Feasibility study • Determination of information needs and system requirements • Involves finding out and documenting what users and management need. • This is the most important aspect of systems analysis.

  14. SYSTEMS DEVELOPMENT LIFE CYCLE • As organizations grow and change, they may need more or better information. • Systems analysis is the first step. It includes: • Initial investigation • Systems survey • Feasibility study • Determination of information needs and system requirements • Delivery of systems requirements • Involves preparation of a report summarizing the systems analysis work. • This report is submitted to the information systems steering committee.

  15. SYSTEMS DEVELOPMENT LIFE CYCLE • The five stages in the systems development life cycle are: • Systems analysis • Conceptual design • Physical design • Implementation and conversion • Operation and maintenance

  16. SYSTEMS DEVELOPMENT LIFE CYCLE • In the conceptual design phase, the company decides how to meet user needs. • Tasks in this phase include: • Identify and evaluate design alternatives • Possibilities include: • Buying software • Developing in-house • Outsourcing

  17. SYSTEMS DEVELOPMENT LIFE CYCLE • In the conceptual design phase, the company decides how to meet user needs. • Tasks in this phase include: • Identify and evaluate design alternatives • Develop design specifications • Involves writing up details of what the system is to accomplish and how it is to be controlled and developed.

  18. SYSTEMS DEVELOPMENT LIFE CYCLE • In the conceptual design phase, the company decides how to meet user needs. • Tasks in this phase include: • Identify and evaluate design alternatives • Develop design specifications • Deliver conceptual design requirements • These requirements will be forwarded to the information systems steering committee.

  19. SYSTEMS DEVELOPMENT LIFE CYCLE • The five stages in the systems development life cycle are: • Systems analysis • Conceptual design • Physical design • Implementation and conversion • Operation and maintenance

  20. SYSTEMS DEVELOPMENT LIFE CYCLE • In the physical design phase, the broad, user-oriented requirements of the conceptual design are translated into detailed specifications that can be used by programmers to code the programs. • Tasks include: • Design outputs, database, and inputs • Develop programs • Develop procedures • Design controls • Deliver developed system • Goes to information systems steering committee

  21. SYSTEMS DEVELOPMENT LIFE CYCLE • The five stages in the systems development life cycle are: • Systems analysis • Conceptual design • Physical design • Implementation and conversion • Operation and maintenance

  22. SYSTEMS DEVELOPMENT LIFE CYCLE • This is the capstone phase during which everything comes together. • Tasks include: • Develop an implementation and conversion plan. • Needed because of the complexity and importance of this phase. • Install any new hardware and software. • Train personnel. • New employees may need to be hired and trained or existing employees relocated. • Test the system and make any needed modifications. • Complete the documentation. • Convert from the old to the new system. • Deliver operational system. • Send the final report to the IS steering committee.

  23. SYSTEMS DEVELOPMENT LIFE CYCLE • The five stages in the systems development life cycle are: • Systems analysis • Conceptual design • Physical design • Implementation and conversion • Operation and maintenance

  24. SYSTEMS DEVELOPMENT LIFE CYCLE • Once the system is up and running, operations and monitoring continue. • Tasks include: • Fine-tune and do post-implementation review. • Operate the system. • Periodically, review and modify the system. • Do ongoing maintenance. • Deliver improved system.

  25. SYSTEMS DEVELOPMENT LIFE CYCLE • Eventually, a major modification or system replacement is necessary, and the systems development life cycle (SDLC) will start over. • In addition to the preceding five phases, three activities are performed throughout the life cycle: • Planning. • Managing behavioral reactions to change. • Assessing ongoing feasibility. • These three activities will be discussed in this chapter. • Additionally, the first phase in the SDLC, systems analysis, will be discussed in more detail.

  26. THE PLAYERS • Many people are involved in developing and successfully implementing an AIS, including: • Top management • Accountants • The information systems steering committee • The project development team • Systems analysts • Computer programmers • External players

  27. THE PLAYERS • Many people are involved in developing and successfully implement an AIS, including: • Top management • Accountants • The information systems steering committee • The project development team • Systems analysts • Computer programmers • External players

  28. THE PLAYERS • Top management’s role in systems development is to: • Provide support and encouragement a clear signal that user involvement is important. • Help align the systems with corporate strategies. • Establish system goals and objectives. • Review IS department performance and leadership. • Establish policies for project selection and organizational structure. • Participate in important systems decisions.

  29. THE PLAYERS • User management needs to: • Determine information requirements for departmental projects. • Assist systems analysts with project cost-benefit estimates. • Assign key staff members to development projects. • Allocate funds.

  30. THE PLAYERS • Many people are involved in developing and successfully implement an AIS, including: • Top management • Accountants • The information systems steering committee • The project development team • Systems analysts • Computer programmers • External players

  31. THE PLAYERS • Accountants also play an important role in systems development: • As AIS users, they must determine their information needs and systems requirements and communicate them to system developers. • As members of project development teams or steering committees, they help management in the development process. • They are also active in: • Designing system controls and monitoring and testing these controls. • Ensuring the system is easy to audit. • Controls and “auditability” need to be built in early to minimize costs and inefficiencies later.

  32. THE PLAYERS • Many people are involved in developing and successfully implement an AIS, including: • Top management • Accountants • The information systems steering committee • The project development team • Systems analysts • Computer programmers • External players

  33. THE PLAYERS • The information systems steering committee is an executive-level committee whose duty is to plan and oversee the IS function. • Consists of high level management, such as: • Controller • IS Manager • User department managers • Sets policies to govern the AIS and assure top-management participation, guidance, and control. • Attempts to encourage goal congruence and reduce goal conflict.

  34. THE PLAYERS • Many people are involved in developing and successfully implement an AIS, including: • Top management • Accountants • The information systems steering committee • The project development team • Systems analysts • Computer programmers • External players

  35. THE PLAYERS • The project development team includes systems specialists, managers, accountants, auditors, and users whose responsibility is to guide development. • Their job: • Plan each project. • Monitor to ensure timely and cost-effective completion. • Ensure the human element is considered. • Communicate project status to top management and steering committee. • Communicate and meet with users to: • Consider ideas • Discuss progress • Eliminate surprises • The team approach produces more effective results and better user acceptance.

  36. THE PLAYERS • Many people are involved in developing and successfully implement an AIS, including: • Top management • Accountants • The information systems steering committee • The project development team • Systems analysts • Computer programmers • External players

  37. THE PLAYERS • Systems analysts study existing systems, design new ones, and prepare specifications that are used by programmers. • They interact with technical personnel and users to bridge the gap. • They are responsible for ensuring the system meets user needs.

  38. THE PLAYERS • Many people are involved in developing and successfully implement an AIS, including: • Top management • Accountants • The information systems steering committee • The project development team • Systems analysts • Computer programmers • External players

  39. THE PLAYERS • Computer programmers write the computer programs, using the specs developed by the systems analysts. • They also modify and maintaining existing programs.

  40. THE PLAYERS • Many people are involved in developing and successfully implement an AIS, including: • Top management • Accountants • The information systems steering committee • The project development team • Systems analysts • Computer programmers • External players

  41. THE PLAYERS • External players include: • Customers • Vendors • Auditors • Governmental entities • Their needs must also be met in systems development.

  42. PLANNING SYSTEMS DEVELOPMENT • Several activities must be performed at various times throughout the SDLC. • One of these activities is planning. • The organization should have plans for: • The long range. • Each systems development project. • Each phase of each systems development project. • We’ll discuss these plans and a number of techniques to develop them.

  43. PLANNING SYSTEMS DEVELOPMENT • We’ve all experienced the disasters that occur when we fail to plan. • When you got it home, you realized it wasn’t compatible with your existing printer and scanner. • Furthermore, it wasn’t equipped for broadband Internet access and you had been hoping to switch to broadband. • By the time you spend the money and buy the parts to equip the computer to do what you want it to do, you find that you could have bought a leading-edge computer for less money. • Suppose you bought a personal computer on impulse without thinking about what you wanted to do with it.

  44. PLANNING SYSTEMS DEVELOPMENT • Systems development planning is an important step for the following key reasons: • Consistency with the organization’s strategic plan. • Efficiency achieved through coordination of the subsystems. • Cutting edge technology and techniques. • Lower costs due to lack of duplication, wasted effort, time overruns, and cost overruns. • Adaptability for future changes.

  45. PLANNING SYSTEMS DEVELOPMENT • When a system is poorly planned, a company must often return to a prior phase and correct errors and design flaws. • These returns are costly and result in delays, frustration, and low morale.

  46. PLANNING SYSTEMS DEVELOPMENT • Two types of systems development plans are needed: • Individual project plans developed by the project teams. • A master plan developed by the IS steering committee.

  47. PLANNING SYSTEMS DEVELOPMENT • Two types of systems development plans are needed: • Individual project plans developed by the project teams. • A master plan developed by the IS steering committee.

  48. PLANNING SYSTEMS DEVELOPMENT • Individual project plans contain: • A cost-benefit analysis. • Developmental and operational requirements, including: • Human resources • Hardware • Software • Financial resources • A schedule of activities to develop and operate the new application.

  49. PLANNING SYSTEMS DEVELOPMENT • Two types of systems development plans are needed: • Individual project plans developed by the project teams. • A master plan developed by the IS steering committee.

  50. PLANNING SYSTEMS DEVELOPMENT • A master plan specifies: • What the system will consist of • How it will be developed. • Who will develop it. • How needed resources will be acquired. • Where the AIS is headed. • It also provides: • Status of projects in process. • Prioritization of planned projects and criteria for establishing priorities. • Timetables for development.

More Related