An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Moderate Risk Waste Facility Design Evolution at King County James Neely NAHMMA 2012 Northwest Conference

  2. Part one: Pilot hhw facility made Semi-permanent

  3. Factoria Transfer Station Pre-Development 2001

  4. Pilot MRW Facility Opened Sept. 2002

  5. Failure of Retractable Awning

  6. 2004: Pilot to Semi-Permanent Facility

  7. Initial Results

  8. Be prepared for the exotics

  9. Consider outdoor storage needs Type 4 Outdoor Explosives Magazine for Marine Flares

  10. Part two: finally a real facility

  11. Rebuilt Factoria transfer station and Moderate Risk waste facility Opening Planned for 2015

  12. Design Considerations Summary • Size • Ventilation and Fire Safety • Ergonomics/Self Service Opportunities • To Bulk or Not to Bulk • Green Building • Employee Comfort

  13. Conceptual design

  14. Local exhaust ventilation

  15. Direct ventilation- best