1 / 30

MECC Central Rollout Technical Information for IT Managers

MECC Central Rollout Technical Information for IT Managers. Warning : no pretty pictures beyond this point. Standard Operating Environment. IE6, IE7 (for now, will review annually) IE8, IE9 Firefox 3+, Safari 4+, Chrome iPhone, Blackberry, iPad , Andriod HTTPS

liza
Télécharger la présentation

MECC Central Rollout Technical Information for IT Managers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MECC Central Rollout Technical Information for IT Managers

  2. Warning: no pretty pictures beyond this point

  3. Standard Operating Environment • IE6, IE7 (for now, will review annually) • IE8, IE9 • Firefox 3+, Safari 4+, Chrome • iPhone, Blackberry, iPad, Andriod • HTTPS • Email to/from *.mecccentral.com

  4. Yes, we support tablets

  5. INTEGRATION • GIS via GeoRSS & KML open standards • Property Data via Google Maps, CSV upload, CouncilView. • MECC-to-MECC data sharing via authenticated XML-over-HTTPS API • Ability to access SQL data directly for Crystal Reports, etc.

  6. Nothing

  7. HOSTING, SECURITY & REDUNDANCY • Cloud-based. • Professionally engineered infrastructure across two Tier-A data centres. • Multiple servers, no single point of failure. • Secure replication, encrypted offsite backups. • DCs in Melbourne and Sydney. • Rapid upscaling based on load. • Regular PCI-DSS penetration tests and scans. • 24 hour infrastructure monitoring and response.

  8. Nothing

  9. SUPPORT • Service desk via phone, email, online. • Standard 9 to 5 service. • 24x7 system monitoring and response. • Outage notification list. • Extended service available during emergencies, including 24 hour support.

  10. TRAINING • Roadshows provide familiarity. • Training certifications for User, Incident Controller, and IT Support will be available from November. • In-system induction videos for users. • Courses are provided online via Web-Ex, and in-person at our Melbourne office. • Can provide training at Council MECC simulations.

  11. PROJECT ROLLOUT SCHEDULE Aug 15 – Aug 31 • Roadshow starts Sep 15 • Last day to sign-up for 2011 rollout • Registrations for training sessions open Nov 15 • Rollout to councils commences • Training starts

  12. Take Away Scope - 69 councils, shared service. Cloud based - no firewall changes, no new infrastructure. Integration - GIS integration via KML and GeoRSS, and optional Council property data via CSV. Roadshows - in next 3 weeks. Sign-up date - by September 15 for 2011 rollout and training courses. More Info - www.mecccentral.com

More Related