LARP Project Update Eric Prebys Joint LARP/HiLumi Meeting NAPA, CA, April 8-10, 2013. Context: Baseline LHC Upgrade Path. *LS = “ Long Shutdown ”. Time Line: LS1*: “ Nominal ” (2013-2014)

lsteiger
Télécharger la présentation

LARP Project Update Eric Prebys Joint LARP/HiLumi Meeting NAPA, CA, April 8-10, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LARP Project UpdateEric PrebysJoint LARP/HiLumi MeetingNAPA, CA, April 8-10, 2013

  2. Context: Baseline LHC Upgrade Path *LS = “Long Shutdown” • Time Line: • LS1*: “Nominal” (2013-2014) • Complete repairs of the superconducting joint and pressure relief problems which cause “the incident” in 2008 and currently limit the energy to 4+4 TeV. • “Lost memory” issues may limit the beam energy to somewhere between 6.5 and 7 TeV per beam. • At least 1x1034 cm-2s-1 peak luminosity • LS2: “Ultimate” (2017) • injector and collimation upgrades • At least 2x1034 cm-2s-1 peak luminosity • LS3: “HL-LHC” (~2022-2023) • Lower b* and compensate for crossing angle to maximize luminosity • 5x1034 cm-2s-1 leveled luminosity Joint LARP/HiLumi Meeting, Napa, CA

  3. Relevance of LARP to CERN Upgrade* Letter to Dennis Kovar, Head, DOE Office of High Energy Physics, 17-August-2010 (…) Joint LARP/HiLumi Meeting, Napa, CA

  4. New Direction for LARP • LARP has historically been an R&D organization • Not well structured for hard deliverables • CERN upgrade plans in a state of flux • Recent developments • CERN has formalized the planning for the luminosity upgrade • In June 2012, CERN chose 150 mm as the aperture for the final focus quads • At the DOE’s request, we are in the process of transforming LARP into a project to encompass all US contributions to the luminosity upgrade of the LHC. • Budget Guidance • Flat-Flat LARP funding @ ~$12.4M/year through FY16 • A total of $200M (then year dollars) TPC, assuming CD-3 at approximately the beginning of FY17 • “Some amount” of General Accelerator R&D (GARD) funds invested in support of this program (still being negotiated). Joint LARP/HiLumi Meeting, Napa, CA

  5. DOE Directive to Labs Also sent to other Ass. Dir. for Acc. (…) • Questions: • Which GAD funds? • How much? • Who controls it and how? Joint LARP/HiLumi Meeting, Napa, CA

  6. Recommendations from July, 2012 LARP Review • Magnets: • Abandon the effort on the 120 mm LHQ and begin work on the 150 mm quad development. The 120 mm work (HQ and LHQ) was sharply reduced and resources have been redirected to the 150 mm prototype • Produce a resource loaded schedule that establishes the path to the final production of the required number of 150 mm quadrupoles to ensure that resources are properly utilized, by September 4, 2012. • Develop an acquisition strategy which seamlessly transitions from the research program into a construction project, by November 1, 2012. These have been integrated with the Management recommendations into an overall milestone schedule. Joint LARP/HiLumi Meeting, Napa, CA

  7. Recommendations (cont’d) • Management • Provide a management plan to give the process for down selecting deliverables for the LHC High Luminosity Project. Sep. 4, 2012 • Make the list of deliverables with fully burdened cost estimates and schedules within a total cost estimate of about $200M (at year dollars) and assuming a flat-flat LARP funding for the next four years. November 1, 2012 • Meet with CERN and DOE to finalize the list of U.S. deliverables and the schedule. December 21, 2012 The exact scale of the US production is still under discussion, and will have to be decided in the context of the overall US program. Thus, we could see a path for satisfying the Magnet Systems recommendations separately and in advance of the overall planning schedule, as implied by the schedules given above. We therefore adopted the following set of combined milestones. Joint LARP/HiLumi Meeting, Napa, CA

  8. New Milestones* • September 4, 2012: Submit down-select plan ✔ • November 1, 2012: Submit a prioritized list of candidate projects with consistent methodology for cost, schedule, and scalability (if applicable). This list would also include details for each project regarding what funds, if any, would be required over and above the LARP funding prior to FY17. Note that at this point, the total cost would certainly still well exceed $200M. ✔ • December 21, 2012: Submit a preliminary proposal for a list of US deliverables to the LHC which will fit within the mandated cost. This proposal will include the schedule for the milestones of a Project Execution Plan (PEP), in accordance with DOE Order 413.3B. ✔ Joint LARP/HiLumi Meeting, Napa, CA

  9. Candidate Projects Considered • Traditional LARP Scope • 150 mm aperture Nb3Sn quadrupoles • Likely just cold masses, divided between here and CERN • Crab Cavities • Prototypes. Production Units. Cryomodules. • High Bandwidth Feedback System • Pick-ups. Processing Systems. Response Kickers. • Collimation • Rotatable collimators. • Hollow electron beams. • New Scope • 11 T Nb3Sn dipoles • Used to make room for collimation in dispersion suppression region • Has been a bilateral CERN/FNAL effort • Large Aperture NbTi D2 separator magnets • First dual aperture magnets near Irs • Has been bilateral CERN/BNL effort Joint LARP/HiLumi Meeting, Napa, CA

  10. The Process • Committee formed consisting of • LARP Management • Eric Prebys, FNAL • Tom Markiewicz, SLACGianLuca Sabbi, LBNL • Peter Wanderer, BNL • CERN HL- • Lucio Rossi, CERN • Oliver Brüning, CERN • DOE • Bruce Strauss, DOE • Labs • Represented by Stuart Henderson, FNAL • Project support • Marc Kaducak, FNAL • Met several times over several weeks, including at the fall meeting in Frascati Joint LARP/HiLumi Meeting, Napa, CA

  11. In Broad Strokes…. • A consensus quickly emerged among all concerned (CERN, DOE, LARP labs) regarding priority • Core Priorities: • Committed to a major stake in Nb3Sn quads • Less than “about half” not considered attractive by anyone involved • This will eat up the lion’s share of resources • Would like to commit to crabs up to the SPS test. • As much production as possible • High bandwidth feedback was seen as a high impact contribution for modest resources. • Back up options: • 11 T dipoles • It was felt that the current R&D work should be continued, funded by GAD funds, up to a negotiated hand-off project. • Hollow electron beams for halo removal • Although there is no solid plan for collimation, it was felt R&D into this effort should be supported, in the event it’s chosen as a primary technology and circumstances allow its funding. • Low priority • There was not much interest in pursuing the D2 separators. Joint LARP/HiLumi Meeting, Napa, CA

  12. Feedback from CERN Top Priority Backup Joint LARP/HiLumi Meeting, Napa, CA

  13. LARP Magnet Development Tree Completed Achieved 220 T/m • Length scale-up Beingtested • High field • Accelerator features Joint LARP/HiLumi Meeting, Napa, CA

  14. HQ Tests • Initial tests at LBNL • Reached 14.6 kA @ 4.2K • Recent tests at CERN • Good agreement with LBNL results • Reached 16.2 kA @ 1.9K • 85% of short sample limit • > nominal current of 14.9 kA! Joint LARP/HiLumi Meeting, Napa, CA

  15. Proposed Magnet Contribution • In June, 2012, the choice was made of 150 mm as the aperture for the focusing quads in the LHC upgrade. • LARP activities have been modified in accordance with this decision and recommendations of the July 2012 review • Curtail existing 120 mm program • Work with CERN to develop a 150 mm prototype (LQXF) • The program will then full transition into a production project to produce the focusing quadrupoles for the LHC upgrade • US contribution • Cold masses for the Q1 and Q3 quads, to be cryostated at CERN • A total of 20 half length (4 m) cold masses, including 2 pre-series units, 16 production units, and 2 spares Joint LARP/HiLumi Meeting, Napa, CA

  16. Crab Cavity Development Joint LARP/HiLumi Meeting, Napa, CA

  17. Proposed Crab Cavity Contribution • LARP has been a major proponent of crab cavities since the beginning • Currently two of the three candidate designs are from within LARP • Crab cavities leverage US expertise and US industry • All prototypes, including the UK prototype, have been built in the US. • Proposal • The LARP R&D program will continue work on the SLAC/ODU and BNL cavity designs • Efforts will increase at FNAL on cryostat design • This will culminate with the delivery of a test cryostat with cavities of one of the designs for a beam test in the SPS (2015 or 2016) • The project will undertake the production of 10 cryomodules (4 per IP + 2 spares) for installation in the LHC upgrade • CERN will provide RF couplers and all required infrastructure Joint LARP/HiLumi Meeting, Napa, CA

  18. High Bandwidth Feedback System • The high bandwidth feedback system is a proposed feedback system for the SPS, which leverages LARP experience with the LHC LLRF system • Proposal • LARP will continue R&D related to the system. • The deliverable would be a functional prototype in the SPS, for which • The US contribution would be the complete “full-function” instability control system hardware, firmware and software necessary to operate at the SPS (and potentially LHC, PS). • The CERN contribution will include the vacuum structures (pickup(s) and kicker(s)) and all tunnel related cable plant. Joint LARP/HiLumi Meeting, Napa, CA

  19. Budget Profile Joint LARP/HiLumi Meeting, Napa, CA

  20. Compare to: $200M TPC +4 years at ~$9M/year ≈$236M Still work to do Joint LARP/HiLumi Meeting, Napa, CA

  21. Status and Plans • Briefed DOE on Feb. 1, 2013 • Very supportive of proposed deliverables • Working with us to divert necessary General Accelerator Research and Development (GARD) funds, as well as additional funding to support our planned spending profile prior to FY17. • Moving ahead with planning • Currently aligning plans with updated DOE budget guidance. • Working with labs to identify GARD contributions. • Planning a review in early May. Joint LARP/HiLumi Meeting, Napa, CA

  22. Non-Project LARP Activities • LARP continues to have significant R&D activities that are not directly related to the project deliverables • Energy deposition studies (will probably move to magnet project) • Beam-beam and general beam physics issues • Hollow electron beams for halo removal • Personnel programs • Toohig postdoctoral fellowship • Long Term Visitors (LTV) program • We are committed to preserving at least some non-project activities after the project starts • Note: LTVs are more expensive now that we also have to pay their salaries! Joint LARP/HiLumi Meeting, Napa, CA

  23. Toohig Fellowship • Named for Tim Toohig, one of the founders of Fermilab • Open to recent PhD’s in accelerator science or HEP. • Successful candidates divide their time between CERN and one of the four host labs. • Past • Helene Felice, LBNL, now staff • Rama Calaga, BNL, now CERN staff • Ricdardo de Maria, BNL, now CERN Fellow • Themis Mastoridis, SLAC, now CERN Fellow • Ryoichi Miyamoto, BNL, now ESS Staff • Dariusz Bocian, FNAL, now Ass. Prof. at The Henryk Niewodniczański Institute of Nuclear Physics • Present • Simon White, BNL • Valentina Previtali, FNAL • John Cesaratto, SLAC • Ian Pong, LBNL • Silvia Verdu Andres, BNL Joint LARP/HiLumi Meeting, Napa, CA

  24. Toohig Interviews at this Meeting • We have three Toohig talks scheduled for this meeting during the Tuesday afternoon Accelerator session • 4:00 - Joseph Calvey, Cornell University • 4:30 - Ilkyoung Shin, University of Connecticut • 5:00 - Subashini De Silva, Old Dominion University • Please use this opportunity to get to know the candidates Joint LARP/HiLumi Meeting, Napa, CA

  25. Long Term Visitors Program • LARP Pays transportations and living expenses for US scientists working at CERN for extended periods (at least 4 months) • Past: • Jim Strait, FNAL – Machine protection/splice consolidation • Steve Peggs , BNL – UA9 • Alan Fisher, SLAC – Synchrotron Light Monitor • Rama Calaga, BNL – crab cavities and commissioning • Eliana Gianfelice, FNAL – abort gap cleaning • Uli Wienands, SLAC – UA9, PS2, PSB • Chandra Bhat, FNAL – flat bunches for Large Pewinski Angle solution, SPS lifetime issues • Present: • Alexey Burov, FNAL – Instabilities in the injector chain, new injection ideas • Extremely successful at integrating people into CERN operations • Big thanks to CERN for their support of this program • Interested parties coordinate with a CERN sponsor and apply to the program (contact me) Joint LARP/HiLumi Meeting, Napa, CA

  26. Impact of LARP Personnel Programs Letter to Michael Procario, Acting Head, DOE Office of High Energy Physics, 9-MARCH-2011 (…) Joint LARP/HiLumi Meeting, Napa, CA

More Related