1 / 20

WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION. 30/08/2013. Beverid ge Williams. development & environment consultants. Parcels A & B are freehold Parcel C - Wurundjeri Way Road & Reserve Parcel D owned by Public Transport Development Authority

lucius
Télécharger la présentation

WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WURUNDJERI WAY ROAD CLOSURE AND COLLINS ST BRIDGE DECLARATION 30/08/2013 Beveridge Williams development & environment consultants

  2. Parcels A & B are freehold • Parcel C - Wurundjeri Way • Road & Reserve • Parcel D owned by Public • Transport Development • Authority • Parcel E - Collins Street • Bridge THE SITE development & environment consultants

  3. Feature of Wurundjeri Way • since 2002 • Sculpture is 25m high & weighs • approx. 20 tonnes. • Sits on a concrete base thought to • weigh 90 tonnes. • Designed by artist Bruce Armstrong • Movement of the Eagle will require • agreement and consent between: • The Wurundjeri Council • Melbourne City Council • Vic Roads • Places Victoria • Bruce Armstrong “BUNJIL” THE EAGLE development & environment consultants

  4. Lend lease has won the tender to develop the entire site • The proposed development will include 100,000m² of office space • 600 Apartments in 7 towers • Construction of a public plaza • Approximate construction cost of 1.5 billion dollars • I’m not allowed to show you any impressive plans • Approval for the development will be by the Minister for Planning , • The Hon. Mr Matthew Guy………… not Melbourne City Council THE PROPOSED DEVELOPMENT BY LEND LEASE development & environment consultants

  5. VIC ROADS - Land Owner - Professional Advice LEND LEASE - Developer - Key financier KEY STAKEHOLDERS AND INTERESTED PARTIES BEVERIDGE WILLIAMS - Surveying Services (Road Closure) - Professional Advice for Places Victoria PLACES VICTORIA - Land Owner - Developer MADIGAN SURVEYING - Surveying Services (Subdivision) - Professional Advice for Lend Lease PUBLIC TRANSPORT VIC - Land Owner MELBOURNE CITY COUNCIL - Referral Authority - Professional advice development & environment consultants

  6. Lot has been designed as a series of sloping and tilting planes • Lot design maximises the amount of developable land in airspace • The lot in airspace must not breach the 5.9m minimum clearance to the constructed road LOT IN AIRSPACE development & environment consultants

  7. LOT IN AIRSPACE(CONTINUED) development & environment consultants

  8. Multiple Sections required to clarify lower limits of the lot • Reduced levels computed to accord with intersection of the • relevant section with the outer edge of each tilted • plane NOT SO TYPICAL CROSS-SECTIONS development & environment consultants

  9. The creation of the lot was designed and computed by Madigan • Surveying and verified by Beveridge Williams NOT SO TYPICAL CROSS-SECTIONS(CONTINUED) development & environment consultants

  10. Discontinuance of Wurundjeri Way will take place under Section 12 of the • Road Management Act 2004 by notice in the Government Gazette • Some confusion on who the land vests in after its discontinuance • Crown has absolute property in Land over which there is an Arterial • Road or Freeway (Schedule 5 (1a) RMA 2004) • YET……… CREATION OF FREEHOLD TITLE TO BE INSERTED INTO MADIGANS STAGED SUBDIVSION development & environment consultants

  11. If VicRoads has discontinued the use of a road or part of a road, it may in accordance with this clause sell the land on which the road or part of the road was located (Schedule 5 (15)(1) RMA 2004) • Legal Advice has been sought and the Victorian Government Solicitor has • advised: • - VicRoads can transfer land to a third party purchaser or • - Include this land within a Plan of Subdivision under Section 35 of the • Subdivision Act 1988 development & environment consultants

  12. Bridge deck will be constructed to sit within the airspace lot (1.5 billion dollar • development will lie on top of the bridge deck) • Columns and Pile Caps will have to be sunk and constructed into Wurundjeri Way to • support the bridge deck: • Who is going to be responsible for them? • Are titles for the supports required? • Possible solutions included: • Leave the columns under the control of VicRoads • Create a Section 173 agreement that covers maintenance • Create (In conjunction with the O.S.G.) C.A.’s for the area covered by the deck and columns. FUTURE WORKS – CONSTRUCTION PHASE development & environment consultants

  13. FUTURE WORKS – CONSTRUCTION PHASE (CONTINUED) • The agreed solution: • The columns and pile caps within the road will be located and discontinued • The titles will be inserted into the Madigans Staged Subdivision and become Common Property along with the deck that they support. • Owners Corporation will be responsible for maintenance of structure within Common Property • Owners Corporation must be fully funded, have the appropriate rules, regulations, insurance and procedures from its inception development & environment consultants

  14. Collins Street Bridge has been accepted by the public and is on Melbourne City Councils • public register of roads • The bridge wasincorrectly declared as Docklands Hwy (Wurundjeri Way) in 2000 COLLINS STREET BRIDGE DECLARATION development & environment consultants

  15. Declaration Survey of Collins Street Bridge Required: • Thorough search of Land Status • As-constructed survey of the bridge deck and piers • Search of historical design drawings for the bridge COLLINS STREET BRIDGE DECLARATION(CONTINUED) development & environment consultants

  16. A best fit of our as-constructed survey with the design drawings for the • bridge revealed that one of the pile caps encroached into Wurundjeri Way • This is of particular importance as: • We do not want to discontinue any part • of the Collins Street bridge structure • We do not want to sink columns • (required for Lend Lease Development) • into pile caps COLLINS STREET BRIDGE DECLARATION(CONTINUED) development & environment consultants

  17. Varying Depth and Height Limitations for Collins Street Bridge Declaration development & environment consultants

  18. Jolimont Railyards • This project has been in the pipeline for years • Construction of a deck over the Railyards opens up Federation Square to the Yarra SIMILAR PROJECT…… DIFFERENT PROCESS development & environment consultants

  19. THANKYOU development & environment consultants

  20. QUESTIONS? development & environment consultants

More Related