1 / 13

Power System

Power System. Supply Reliability and Performance Pledges. Tariff. Why talk to CLP ?. How Can CLP Help?. Contact Us. FAQ. Back to main page. Power System. Generation CLP has 3 generation plants located in the New Territories and 2 located on the Mainland.

lucus
Télécharger la présentation

Power System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power System Supply Reliabilityand Performance Pledges Tariff Why talk to CLP? How Can CLP Help? Contact Us FAQ

  2. Back to main page Power System Generation CLP has 3 generation plants located in the New Territories and 2 located on the Mainland. CLP and Hong Kong Electric’s (HEC) networks are interconnected to back up each other in cases of emergency. This means that there are no less than 6 supply sources to the CLP network at any point in time.

  3. Back to main page Power System Transmission Network CLP’s transmission system is connected to Hong Kong Electric’s and to the China Southern Power Grid via transmission circuits. This connection safeguards CLP customers from any major power loss during cases of emergency.

  4. Back to main page Power System Distribution Network CLP’s distribution network is based on 11kV Closed Ring supply system. This ensures that there is enhanced supply security. This arrangement also provides substantial cost saving for data center operators trying to achieve n+1 supply reliability through cost avoidance.

  5. Back to main page Supply Reliability and Performance Pledge

  6. Tariff Back to main page CLP’s tariff is amongst the lowest in the world for its level of reliability. In addition to being one of the lowest cost our tariff has the following features : • Simple Structure – Data center operators have a choice of 3 simple tariff types, 2 of which are “time of use” based. Charges are based on actual demand and actual consumption. • Transparent – All components of the tariff are published. • Stable – CLP tariff is reviewed once per annum enabling customers budget certainty.

  7. Back to main page Why talk to CLP Power? • Robust Network – 99.99% reliability • Dedicated staff with technical and business skills to provide your data center electricity solutions • Stable Tariff – Tariff is reviewed once per annum enabling customers certainty of budget • Cares for the environment

  8. Working with CLP Power Back to main page CLP can help data center customers as follows • Location selection • Works interface – your internal installation and CLP’s installation • Fast track power supply • Project Management • Asset purchase and installation • Post installation asset maintenance • Post installation energy management

  9. Back to main page Working with CLP Power CLP has a dedicated team to handle all data center electricity supply enquiries. You may reach the team at the address provided below. Address: 7/F Shumshuipo center, No. 215 Fuk Wa Street Or you may send in your enquiry email to accmgr@clp.com.hk

  10. Back to main page Frequently Asked Questions (FAQ) Q1: What is the supply lead time for the provision of electricity supply? Answer: The supply lead time will depend on the potential data center site and the requested electricity demand. It will also depend on CLP’s works programmes and other customer projects. CLP can provide the estimated supply lead time within a few days of notification of the location and the loading. Q2: Can CLP fast track power supply? Answer :CLP will endeavour to fast track energisation and supply depending on load demand and commitments on uptake. We encourage you to speak to our team dedicated to handling all enquiries on data center power supply.

  11. Back to main page Frequently Asked Questions (FAQ) Q3: How can CLP maintain reliability levels at 99.99 % when it is the only supplier? Answer: It is not necessary for power supply to be sourced from two different generation companies for it to be more reliable. CLP strength lies in its network. With any electricity utility supply system, most power disturbances originate from the network i.e due to accidental cable damage, lightning etc. CLP’s robust network is able to eliminate any disturbances before it affects customers. Q4: How does the interconnection between CLP, HEC and Guangdong Power Grid work? Answer: HEC supports CLP and vice versa in case of any power supply emergency. CLP purchases a portion of its power supply for its customers from Guangdong Daya Bay Nuclear Power Station.

  12. Back to main page Frequently Asked Questions (FAQ) Q5: Given CLP’s system connectivity with Hong Kong and Guangdong can a data center operator claim to be a tier 4 data center? Answer: The data center "tier" definitions were developed by data center professionals. It is not for CLP to determine whether a data center operator can claim to be a tier 4 data center based on CLP’s supply network. We can advise though, that CLP’s network can obtain power from multiple supply sources, 3 from power stations located in the New Territories and 2 on the Mainland. In addition, CLP and HEC back-up each other through the interconnection in case of a power supply emergency. Whether the data center operators conclude the above as being a dual or multiple source will depend on their interpretation of a “Tier 4” data center.

  13. Back to main page Frequently Asked Questions (FAQ) Q6: Are CLP electricity tariff rates negotiable? Answer: CLP’s tariff rates are fixed and all components are transparent. Customers may apply for the rate that is appropriate to their actual consumption. CLP’s tariff is amongst the most competitive in comparison with other world class cities. Our tariff table is available at https://www.clponline.com.hk/myBusiness/CustomerService/TariffOverview/Pages/Default.aspx Our dedicated data center team will be happy to advise you on the most appropriate tariff for your load.

More Related