COSMIC System and CDAAC Status COSMIC All Staff Meeting July 1, 2007

COSMIC System and CDAAC Status COSMIC All Staff Meeting July 1, 2007. Ground Systems - NOAA RTS Status. Transition to NOAA RTS’s occurred Apr 15, 2008 Some minor outages first few weeks - now stable with better latency than USN Fairbanks, Alaska, FBKS01

madra
Télécharger la présentation

COSMIC System and CDAAC Status COSMIC All Staff Meeting July 1, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COSMIC System and CDAAC StatusCOSMIC All Staff MeetingJuly 1, 2007

  2. Ground Systems - NOAA RTS Status • Transition to NOAA RTS’s occurred Apr 15, 2008 • Some minor outages first few weeks - now stable with better latency than USN • Fairbanks, Alaska, FBKS01 • Some (1-2) commands still being dropped, but NSPO resends next pass • 5m Malibu (FBKS02) backup ready in early September, until then use 26m as downlink backup • Wallops, Va, WALL01 • Uplink backup commanding for FBKS01 • Tromso, Norway, NORTG5 • Svalbard, Norway, NORSG4 • downlink backup, • Uplink backup commannding ended June 30 • McMurdo, Antarctica, NSF/NASA site, 6 passes/day • Pre-Operational test week July 14-20

  3. USN and NOAA COSMIC Data Latency USN NOAA

  4. Current Occultation Count

  5. COSMIC FM Status • FM1 • Nominal, Ant 00 problems • FM2 • 50% Power shortage since Feb 28, 2007 , reason unknown • Lost 1 of 2 solar arrays • GOX at 66% duty cycle • TIP and TBB off • FM3 • SAD anomaly Aug 3, 2007, reason unknown • SAD stuck at 60 deg • GOX at 50% duty cycle • TIP and TBB off • ~740 circular? km orbit, precessing wrt constellation • FM4 • Nominal • FM5 • Nominal, Ant 00 problems • FM6 • Nominal, Ant 00 problems • Occasional attitude problems • MIU - GOX/SSRPC data gaps require DOUBLE DUMPs

  6. GPS Occultation Payload Firmware Status • Build 4.5.2 Uploaded to All FM’s • Still issues with poor L2 tracking (~ 15%) • Sergey will soon tune L2 QC • Still issues with ‘closing loop’ with rising occultations • L2C Tracking turned on for FM1 • ~ 1 month of L2C occ data (PRNs 12, 17, 31) • Improved L2 penetration • Still some tracking issues for L2C • Sergey will test L2C OL tracking in Moscow this summer • JPL working issues

  7. CDAAC Status • Real-Time processing going well • Post-Processing ~2 months after real-time • COSMIC, CHAMP, GRACE (starting now), SAC-C (starting soon), GPS/MET (starting soon) • Re-Analysis Processing every year with consistent s/w • CDAAC => MDAAC, Multi-Mission RO Center • METOP, CNOFS, PROBA-2 • Public release of CDAAC software • Ionospheric Scientist position still open • Preparing for COSMIC WS in Oct in Taiwan