An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSPI: PEPSI installation preparation, includes all of the pier modifications LBT Q4 2007 Engineering Review

  2. Highlights (Q4/2007) PEPSI bridge location utilities installed, except power PEPSI bridge location, have installed clean dry air, 47 deg chill water, and fiber optic Started installation of power Started on raising height of florescent lights and boxes Schedule PEPSI team, Frank and Emil visit first of year 2008 Cable chain designs have been tested and failed controlling the fiber motion across the elevation axis Installed AZ hole support structure

  3. Open Issues Technical None Schedule Part scheduled Financial Cost of paint and materials Resource Identify paint and paint contractor

  4. Progress (Q4/2007) Install 47 deg coolant, clean dry air, and fiber to PEPSI bridge location Working on other modifications to the pier Fiber run control cable chain being worked on AZ hole support structure is installed Gallery brackets are installed

  5. Planning (Q1/2008) Terminate fibers Define and install the connection point box Install power Move J box in pier up to 4 M, Q3 2007 Move florescence lights in pier up to 4 M, Q3 2007 Installing energy chain/ cable chain Install services, E-net, E-stop, telephone Insulate all pipe carrying liquids Epoxy paint entire floor Paint walls with epoxy paint