1 / 14

TC SCP TEC STATUS REPORT TO PLENARY #63

TC SCP TEC STATUS REPORT TO PLENARY #63. Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle. SCP(14)000090r1. Meetings Since Last TC SCP Plenary. SCP TEC #51 10-14 March 2014 Sophia-Antipolis, France (ETSI). Discussions, hot topics (1/4).

maire
Télécharger la présentation

TC SCP TEC STATUS REPORT TO PLENARY #63

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TC SCP TEC STATUS REPORT TO PLENARY #63 Paul JOLIVET, Chairman, LG ElectronicsSebastian HANS, Vice chairman, Oracle SCP(14)000090r1

  2. Meetings Since Last TC SCP Plenary • SCP TEC #51 • 10-14 March 2014 • Sophia-Antipolis, France (ETSI)

  3. Discussions, hot topics (1/4) • General issues, meeting schedule • Meeting organisation • The last meeting was a 5-day meeting • eUICC input represents the biggest part of the workload • Next meetings are all scheduled to be 5 day meetings • Meeting schedule until July 2014 proposed, ongoing checks on dates until the end of year 2014 • eCAT • Corrections to eCAT and eCAT Secure Channel were accepted (CRs provided) • CR were proposed for the API part of eCAT • Postponed for further work • An API ad hoc session (F2F or conference call) to be planned

  4. Discussions, hot topics (2/4) • Embedded UICC (eUICC) • Draft specification • Draft 0.0.5 the specification is available • Input is delivered in pCRs • 2 pCRs were accepted and the draft specification updated accordingly • GSMA specification was attached to a LS to TEC • The document was presented to the meeting although there were objections from some members • There is no intention to copy or reference the full document • It is expected that interested companies will make contributions based on this document if required

  5. Discussions, hot topics (3/4) • Liaison from/to 3GPP CT6 • LS on maximum delay due to NULL bytes • SCP TEC waits feedback from 3GPP2 before making CRs • Postponed to next TEC • LS on optimisation of power consumption of MTC devices • Discussed during the meeting • Postponed for further work at next meeting • LS on removal of 3GPP related text in TS 102 223 • 3GPP specific parameters were spotted • Removal is only possible after checking that 3GPP implement them (in TS 31.111

  6. Discussions, hot topics (4/4) • Contactless API testing • Some LSs and discussion with TEST • Response LS was sent to TEST • Some points were postponed to the next TEC meeting for further work and discussion • Contactless • A LS from NFC Forum was checked on the management of multiple SEs and HCI/NCI • This document was provided for information, no specific action was required, • Waiting for the agreement on requirements • Contactless P2P is put on hold, as there is no new contribution

  7. Documents sent back by Plenary • Coding of the SPI : SCP(14)000045 • Sent back due to security concerns from Oberthur Technologies • The CR was split into two CRs by Orange prior TEC • SCPTEC(14)000013 is postponed for further work • SCPTEC(14)000014r2 was accepted at TEC (and presented to this meeting) • There is an agreement in the group that those CRs can be considered separately

  8. Request for advice • None

  9. Outcome Documents – CRs • List of TEC accepted CRs available in SCP(14)000091r1 • Change Requests • 2 CRs to TS 101 220 • 8 CRs to TS 102 223 • 1 CR to TS 102 225 • 1 CR to TS 102 484 • Statistics: • 12 CRs • Releases: • 1 on Rel-10 • 4 on Rel-11 • 7 on Rel-12 • Categories • 1 Cat A • 1 Cat B • 3 Cat C • 3 Cat D • 4 Cat F

  10. Outcome Documents – WIDs • New WID • None • Updated WID • None

  11. Outcome Documents – TSs • None

  12. Outcome Documents – LSs • LS to SCP • None • LS cc SCP • to 3GPP TSG CT6 : SCP(14)000051r1 - Removing 3GPP related information from TS 102 223 (BCCH, Timing Advance, LND) • to ETSI SCP TEST : SCP(14)000024r5 – Answer to two TEST Clarification requests • Other LS • SCPTEC(14)000047r2 LS to REQ on Naming of off-card entities of the eUICC

  13. Next Steps / Milestones • Open topics: • Contactless P2P • Documents where noted • New input is expected to reopen discussion • Secure Channel API • Input discussed, limited feedback slowly moving topic • eUICC • Long discussions • Exchanges with REQ • High workload expected • and TEI…

  14. Meeting Schedule TC SCP TEC • SCP TEC #52 • 2-6 June 2014 • Seoul, Korea (Samsung) • SCP TEC #53 • 7-11 July 2014 • Sophia-Antipolis, France • SCP TEC #54 • Beginning Oct 2014 • TBC • Conference calls • To be planned depending on participants’ availability • Ad hoc meetings • Potential ad hoc for eCAT API • Other if required • Joint sessions • None scheduled at that stage

More Related