An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Solar Bike Install Jim Hickey

  2. 1 Controller on the board MDF board cut to profile of a Deuter handlebar bag, board with gal straps and machine screws fitted for concept proof

  3. 2 Controller on the board Another view showing mounting arrangement and foam shock absorbers.

  4. 3 Controller bag fitted With the Deuter handlebar bag fitted

  5. 4 Controller bag fitted Controller is now fitted in bag.

  6. 5 Controller retainer screw Controller is retained at top by the center machine screw engaging in the extrusion

  7. 6 Controller bag and thumb View from the riding position showing the controller bag mounted via a handlebar basket bracket on the headstem and the thumb throttle just inboard of the right gear selectors

  8. 7 Battery Install Right Side Right hand side view showing battery mounting

  9. 8 Front Axle Left Looking up at the left side of the front axle showing the re-worked axle tab washers and the press fit of the washer into the fork.

  10. 9 Front Axle Right Looking up at the right side of the front axle showing the re-worked axle tab washers and the press fit of the washer into the fork.

  11. 10 Control Unit connected All of the wiring connected to the controller and ready to test

  12. 11 Control Unit Side All closed up, controller now hidden by a plain bag, wires neatly routed to battery, motor and throttle

  13. 12 Control Unit Top View How it looks from the riding position

  14. 13 Front on view Front view

  15. 14 LHS view Left hand side view showing battery installation and battery power wires routed alongside battery bracket, up to the handlebar basket bracket (secured with cable tie) and then into the bag

  16. 15 Top Down View Just a shot to show how clean the install looks

  17. 16 RHS View And one last pic for luck