WP1: State Of Progress by Actions 21/05/2012

WP1: State Of Progress by Actions 21/05/2012. Fondaterra Organization.  Fondaterra new Organization of the Corporate Governance. BSC Actions : progress, so far. WP1 Outputs- tool to summarize actions. WP1 Outputs Localized in WP1 section, under «  WP1 ». Documents can be downloaded.

mairi
Télécharger la présentation

WP1: State Of Progress by Actions 21/05/2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP1: State Of Progress by Actions21/05/2012

  2. Fondaterra Organization  Fondaterra new Organization of the Corporate Governance

  3. BSC Actions: progress, so far

  4. WP1 Outputs- tool to summarize actions • WP1 Outputs • Localized in WP1 section, under « WP1». Documents can be downloaded. • The WP1 Outputs is a simple but necessary document • It gives every BSC the different steps inside the WP1. • Please Fill the document with the information

  5. WP1: Action 1- The Launch of the BSCs: Status & Process Average audience = 65 attendees • Any information about BSCs’launch is available on the Team Space, in WP1 section, under “ Action 1” • Almost every BSC has been Launched: • Eindhoven, Netherlands, 17 April 2012. • Birmingham, England, 29 March 2012. • Tweed, Wallonia, Belgium, 29 March 2012. • 2 are still missing: • NRW, Germany, No date. • Les Mureaux, France, June 21st, 2012

  6. The BSCs and Communication • In each BSC, communication events and tools will be developed : • Dissemination events • Seminars • E-newsletters, printed materials (flyers, brochures) ( Go to the Team Space, Communication Tools) • Public Relations,    • For these : • Use the websites (externally), Team Space (project, internally) media and business  (LinkedIn) and social media (Facebook, Twitter) • Develop a database of all our contacts and use it to communicate

  7. WP1: Action 1- BioenNW Requirements Documents • Team Space WP1 Actions1 • Localized in WP1 section, under « WP1». Documents can be downloaded. • The BioenNW Requirements Document is a key of the communication project • It gives everyone a whole view of what each BSC is doing. • Please Fill the document with the information

  8. WP1 : Action 2 Create and populate an information facility • Localized in WP1 section, under « Action 2 ». Documents can be downloaded. • Documents on the bioenergy projects  and on the resources available in Ile-de-France. • Documents are contact points, presentations, case studies information, table, reports, maps, synthesis… •  All classified by keywords • BSC will contain : a library of documents, contact points, websites, case studies information on natural resources

  9. WP1 : Action 3- Identify locations with high potential for bioenergy adoption • Objectives • Reviews of bioenergy potential in each region • A methodology for the collection of detailed information to support the production of project development plans • Select the best candidates with high bioenergy potential : five in each region

  10. WP1 : Create and operate Bioenergy Support Centres • Action 4 : Develop a business plan for the ongoing operation of the BSCs after project end • Action 5 : Develop Bioenergy Support Centres in Observer regions • Daughter BSCs ready for launch before the end of BioenNW : one in each observer region . • BSC promotional events hosted by Observer aimed at recruiting local interest in forming a BSC : two in each region • Action 6 : Develop a feedstock testing service • Two mobile feedstock testing units to provide a feedstock testing service operated in Partner countries and in Observer countries. • Characterization of a wide range of feedstocks with data added to BSC databases for use in the design of bioenergy schemes.

  11. The Solution to Be Efficient • Work Together. And work together means use the Team Space to share, spread and ask for information • Some of the partners don’t use the Team Space. Some haven’t even used it once until now  Everyone is involved • In April, only 7 members out of 25 have used the Team Space despite of all the changes we made! • Please, If you don’t have any user name and password, Contact Us: • johann.audrain@fondaterra.com • diego.courtois@fondaterra.com